All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Install/replace medium/high voltage equipment and hardware |
SAQA US ID | UNIT STANDARD TITLE | |||
259206 | Install/replace medium/high voltage equipment and hardware | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 6 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
113883 | Install / replace medium / high voltage equipment and hardware | Level 4 | NQF Level 04 | 6 |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the electrical distribution station environment.
The person credited with this unit standard is capable of planning, installing & replacing, Medium/High Voltage equipment (current/voltage transformers, isolators, breakers, surge arrestors) according to statutory requirements to distribute and control electricity to electrical installations. This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
Medium/High Voltage equipment include, but are not limited to:
Medium/High Voltage cables/conductor terminations include, but are not limited to: Hardware includes, but is not limited to: |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan to install Medium/High Voltage equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The unit`s site location/point number, type and kVA/kA rating established according to system electrical diagrams and project plan specifications. |
ASSESSMENT CRITERION 2 |
Job instructions are obtained and outage arranged according to pre-task plans and project requirements. |
ASSESSMENT CRITERION 3 |
The unit obtained, pre-commissioning tests arranged and test certificates submitted according to pre-commissioning procedures and statutory requirements. |
ASSESSMENT CRITERION 4 |
Tools, materials, transport/rigging and safety equipment required for installing the unit are selected and checked for functionality according to statutory requirements. |
SPECIFIC OUTCOME 2 |
Prepare to install Medium/High Voltage equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The unit is loaded and transported to the installation site as per safe work procedures. |
ASSESSMENT CRITERION 2 |
Worksite is inspected for hazardous conditions and corrective action is taken according to Occupational Health and Safety Act requirements. |
ASSESSMENT CRITERION 3 |
Work area is demarcated/barricaded according to statutory requirements/operating regulations for High Voltage systems. |
ASSESSMENT CRITERION 4 |
Lattice structure/equipment base plate prepared for installation according to manufacturer`s specifications/ project requirements. |
ASSESSMENT CRITERION 5 |
Earth straps prepared and installed according to project requirements. |
SPECIFIC OUTCOME 3 |
Remove Medium/High Voltage equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Assess the site for access and clearances/constraints prior to new installation. |
ASSESSMENT CRITERION 2 |
Ensure that the unit to be replaced is isolated, earthed and permits in place/worker`s register signed as per operating regulations for High Voltage systems. |
ASSESSMENT CRITERION 3 |
Earth straps auxilliary cables/terminations and droppers/jumpers are suitably marked and disconnected. |
ASSESSMENT CRITERION 4 |
The unit is rigged and removed from the lattice structure. |
ASSESSMENT CRITERION 5 |
Tools, rigging and personal protective equipment are used safely according to job specifications and statutory requirements. |
SPECIFIC OUTCOME 4 |
Install Medium/High Voltage equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The new unit is rigged, positioned and secured according to statutory requirements and worksite procedures. |
ASSESSMENT CRITERION 2 |
Earthing conductor/straps are terminated according to job specifications. |
ASSESSMENT CRITERION 3 |
Auxiliary cables are terminated according to electrical cabling diagrams and job requirements. |
ASSESSMENT CRITERION 4 |
Medium/High Voltage droppers/jumpers are terminated and torqued correctly according to manufacturer`s specifications. |
ASSESSMENT CRITERION 5 |
Tools, rigging and personal protective equipment are used safely according to job specifications and statutory requirements. |
SPECIFIC OUTCOME 5 |
Complete work task. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work area is cleaned after completion of task according to housekeeping standards. |
ASSESSMENT CRITERION 2 |
Ensure that the replaced unit has been returned to the stores/workshop. |
ASSESSMENT CRITERION 3 |
Waste materials are disposed of according to environmental requirements. |
ASSESSMENT CRITERION 4 |
Necessary documentation is completed and submitted to designated personnel. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO ORGANISING |
Organise oneself and one`s activities responsibly and communicate effectively during planning, preparing and performing the task. |
UNIT STANDARD CCFO COLLECTING |
Collect, evaluate, organise and critically evaluate information related to installing and replacing Medium/High Voltage equipment so that these are accurately interpreted into application performance standards. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard replaces unit standard 113883, "Install/replace medium/high voltage equipment and hardware", Level 4, 6 credits.
Supplementary Information: Specified Requiremets: Legal Requirements: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 72052 | Further Education and Training Certificate: Electrical Engineering | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | ESKOM GENERATION - PALMIET PUMP STORAGE GRABOUW |
2. | KP ACADEMY (PTY) LTD |
3. | POWER SYSTEMS TRAINING, CAPE TOWN |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |