All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Install, connect and commission a stand-alone battery charging wind turbine |
SAQA US ID | UNIT STANDARD TITLE | |||
259196 | Install, connect and commission a stand-alone battery charging wind turbine | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 8 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
116679 | Install, connect and commission a stand-alone battery charging wind turbine | Level 4 | NQF Level 04 | 8 |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Electrical Engineering, Generation, Distribution, Transmission, Construction and Renewable Energy Sector.
A person credited with this unit standard will be capable of: This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and/or equivalent:
|
UNIT STANDARD RANGE |
> Multimeters. > Insulation tester. > Clip-on ammeter. > OHS Act. > SABS Regulations. > NRS Code of Practise. > Local Authority requirements. > Manufacturer's specifications. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan to install, connect and commission a wind turbine. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Sequence of operation is interpreted and determined as per Job instruction. |
ASSESSMENT CRITERION 2 |
Applicable electrical drawings are correctly interpreted and selected to meet job requirements. |
ASSESSMENT CRITERION 3 |
Equipment and personal protective equipment is selected, inspected and checked for functionality and safety prior to commencement. |
ASSESSMENT CRITERION 4 |
Safety procedures related to job requirements and work site procedures are obtained. |
ASSESSMENT CRITERION 5 |
The wind turbine, its associated electronic control devices and battery bank and mast are identified and selected according to job instructions. |
ASSESSMENT CRITERION 6 |
Permission is obtained to carry out task according to instructions and drawings. |
ASSESSMENT CRITERION 7 |
Appropriate tools are identified and selected to meet the requirements of the task according to statutory requirements. |
SPECIFIC OUTCOME 2 |
Prepare to install, connect and commission a wind turbine. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work area is demarcated in accordance with work site procedures. |
ASSESSMENT CRITERION 2 |
Wind turbine, its charge regulator and mast are checked in accordance with manufacturer specifications and functional requirements. |
ASSESSMENT CRITERION 3 |
Work site is inspected for safety and hazards and corrective action is taken according to statutory requirements. |
ASSESSMENT CRITERION 4 |
Installation area is prepared for the placing/mounting and securing the wind turbine mast and stay cables, as per job instructions, drawings and diagrams |
SPECIFIC OUTCOME 3 |
Install and connect a wind turbine. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Appropriate tools are selected and used correctly as per manufacturer's specifications and work site standards according to statutory requirements. |
ASSESSMENT CRITERION 2 |
All personal protective equipment is used as per safety requirements and work site standards. |
ASSESSMENT CRITERION 3 |
The generator and slip rings are tested for functionality in terms of desired operational requirements. |
ASSESSMENT CRITERION 4 |
The mast, gin pole, stays cables, winch, winch cable is placed in position, and all cables fastened and readied for erection in accordance with relevant safety requirements. |
ASSESSMENT CRITERION 5 |
Supply cables are connected as per manufacturer's manuals, specifications, drawings, instructions and statutory requirements. |
ASSESSMENT CRITERION 6 |
The wind turbine and mast are raised into upright position and the stay wires secured and tightened as per the manufacturers specifications and relevant safety requirements. |
SPECIFIC OUTCOME 4 |
Connect wind turbine to charge regulator. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Appropriate tools are used to meet the requirements of the task according to statutory requirements. |
ASSESSMENT CRITERION 2 |
All personal protective equipment is used as per safety requirements and work site standards. |
ASSESSMENT CRITERION 3 |
Supply cable is installed, between wind turbine and charge regulator in accordance with relevant SANS requirements. |
ASSESSMENT CRITERION 4 |
The cable is connected to the charge regulator as per manufacturers manuals, specifications and operational requirements. |
ASSESSMENT CRITERION 5 |
The charge regulator is connected to the battery bank and load according to manufacturers specifications and operational requirements. |
SPECIFIC OUTCOME 5 |
Commission a wind turbine. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Appropriate test and measuring equipment are selected to meet the job requirementsc. |
ASSESSMENT CRITERION 2 |
Measuring and testing equipment are used correctly and safely as per work site procedures. |
ASSESSMENT CRITERION 3 |
Tests are carried out according to Worksite procedures and statutory requirements. |
ASSESSMENT CRITERION 4 |
Faultfinding is carried out as per the manufacturers manuals and maintenance procedures. |
ASSESSMENT CRITERION 5 |
Faultfinding is carried out as per the manufacturers manuals and maintenance procedures. |
SPECIFIC OUTCOME 6 |
Complete installation, connection and commissioning of a wind turbine. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work area is restored to serviceable condition according to statutory requirements. |
ASSESSMENT CRITERION 2 |
Appropriate tools are cared for and stored according to statutory requirements. |
ASSESSMENT CRITERION 3 |
Damaged or faulty tools are identified, marked for repair or replacement or reported according to statutory requirements. |
ASSESSMENT CRITERION 4 |
Tests are recorded and reported as per work site procedures and standards. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems in installing, connecting testing and commissioning a wind turbine. |
UNIT STANDARD CCFO WORKING |
Work effectively with others involved during installation, connecting and commissioning a wind turbine. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself in planning the work and determining a sequence of operation. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information obtained during installation, connecting and commissioning a wind turbine. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate with fellow workers and involved parties, the interpretation and reporting processes. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard replaces unit standard 116679, "Install, connect and commission a stand-alone battery charging wind turbine", Level 4, 8 credits.
Specified Requirements: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 72052 | Further Education and Training Certificate: Electrical Engineering | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | ESKOM GENERATION - PALMIET PUMP STORAGE GRABOUW |
2. | KP ACADEMY (PTY) LTD |
3. | POWER SYSTEMS TRAINING, CAPE TOWN |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |