All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Inspect, test and maintain 3-kV DC regeneration equipment in traction sub-stations |
SAQA US ID | UNIT STANDARD TITLE | |||
259190 | Inspect, test and maintain 3-kV DC regeneration equipment in traction sub-stations | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 5 | Level TBA: Pre-2009 was L5 | 8 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
A learner credited with this unit standard will be able to inspect, test and maintain 3-kV DC regeneration equipment in traction sub-stations in an electrical environment as well as ensuring the continuity and availability of dynamic regenerative breaking and absorption of generated electrical energy in the Rail Sector. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
The range of this unit standard may be limited to carrying out diagnostic testing and applying preventative maintenance and replacement repairs where necessary on:
|
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and prepare for inspection, testing, maintenance and repairs on 3-kV DC regeneration equipment in traction sub-stations. |
OUTCOME RANGE |
Reliable centred maintenance planning periods/schedules, tools, equipment, spares, cleaning material, drawings and documents. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Inspection, testing, maintenance and repairs on 3-kV DC regeneration equipment in traction sub-stations are correctly planned and prepared. |
ASSESSMENT CRITERION RANGE |
Planning and preparation of inspection, testing, maintenance and repairs on 3-kV DC regeneration equipment in traction sub-stations can include but is not limited to outage schedules, manufacturer's specifications and requirements, other disciplines, control centres, associated equipment, operating history reports, failure rate, maintenance programs, plant availability, and customer requirements, etc. |
ASSESSMENT CRITERION 2 |
The scope of work and equipment to be tested maintained and repaired as identified according to the job requirement. |
ASSESSMENT CRITERION RANGE |
The scope of work and equipment to be maintain can include but is not limited to associated `check and/or inspection lists`, procedures and job required diagnostic tests, maintenance and repairs for 3-kV DC regeneration equipment. |
ASSESSMENT CRITERION 3 |
Equipment, tools, spares, materials are identified and sourced for the required work according to the job requirements. |
ASSESSMENT CRITERION RANGE |
Equipment, tools, spares, materials can include but is not limited to general tools, spares, materials, computers, inspection sheets`, procedure sheets, relevant lifting equipment, etc. |
ASSESSMENT CRITERION 4 |
Equipment test instruments and specialised tools needed for maintenance and repairs are identified and sourced, as per manufacturers manual, work site procedures and standards. |
ASSESSMENT CRITERION RANGE |
Equipment test instruments and specialised tools needed for maintenance and repairs can include but is not limited to various test instruments, test equipment, circlip pliers, dynamometer and manufacturer's special tools, etc. |
ASSESSMENT CRITERION 5 |
The inspection, diagnostic testing, maintenance and repair requirements are interpreted, and analysed for determining the performance and quality standards required. |
ASSESSMENT CRITERION RANGE |
The inspection, diagnostic testing, maintenance and repair requirements can include but is not limited to manufacturer's guidelines, industry maintenance standards, worksite procedures, guidelines, standards, etc. |
ASSESSMENT CRITERION 6 |
3-kV DC regeneration equipment in traction sub-stations identified and manufacturer's manual and company specific guidelines and standards obtained to check scope of work and requirements. |
ASSESSMENT CRITERION RANGE |
3-kV DC regeneration equipment in traction sub-stations manufacturer's manuals can include but is not limited to manufacturer`s guidelines, industry maintenance standards, worksite procedures, guidelines, standards, etc. |
SPECIFIC OUTCOME 2 |
Communicate clearly and concisely without misunderstanding with relevant role players and complete relevant documentation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Relevant documentation is completed correctly. |
ASSESSMENT CRITERION RANGE |
Documentation can include but is not limited to, company specific orders, company specific documentation, time sheets, work and test permit procedures, etc. |
ASSESSMENT CRITERION 2 |
Communications related to inspect, test and maintain 3-kV DC regeneration equipment are carried out effectively. (Electrical control and Train Control Officer). |
ASSESSMENT CRITERION RANGE |
Communications related to inspect, test and maintain 3-kV DC regeneration equipment in traction sub-stations can include but is not limited, 2-way radios, cellular phones, trunk radios, hand-held emergency telephones, etc. |
SPECIFIC OUTCOME 3 |
Carry out inspection and tests on 3-kV DC regeneration equipment in traction sub-station. |
OUTCOME RANGE |
History operation reports, visuals, on site tests. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The 3-kV DC regeneration equipment in traction sub-stations history and operational/maintenance records are scrutinised indicating service needs noted for attention during the routine servicing as per maintenance procedure. |
ASSESSMENT CRITERION RANGE |
The 3-kV DC regeneration equipment in traction sub-stations defect history and operational/maintenance records can include but is not limited to fault operations, malfunction, reported problems, mechanism failures, excessive arcing damage, environmental damage (including weather), hi-pot tests, calibration tests, etc. |
ASSESSMENT CRITERION 2 |
The inspections on 3-kV DC regeneration equipment in traction sub-stations are carried out safely and correctly according to the maintenance check sheets, any damage or defects are identified as per manufacturer's specification, worksite operational standards and settings and company specific specifications. |
ASSESSMENT CRITERION RANGE |
Inspections to identify any damage or defects on 3-kV DC regeneration equipment in traction sub-stations can include but is not limited to damaged insulators, corrosion, wear and tare, stress cracks, lack of lubrication, UV damage, vermin proofing, contact pitting, alignment, heat related damaged, etc. |
ASSESSMENT CRITERION 3 |
The diagnostic tests are correctly carried out as per manufacture requirements and the results analysed for interpreting the maintenance required. |
ASSESSMENT CRITERION RANGE |
The diagnostic test can include but is not limited to tests insulation tests, contact resistance, auxiliary contact tests, motor operations, alarm settings, status indications to control panel, contact pressure, etc. |
ASSESSMENT CRITERION 4 |
Personal protective equipment is used and site specific procedures are adhered to throughout the inspection, testing, maintenance and repair process. |
ASSESSMENT CRITERION RANGE |
Personal protective equipment can include but is not limited to safety overalls, gloves, goggles, safety boots, dust mask, etc. |
ASSESSMENT CRITERION 5 |
The results of the diagnostic tests are correctly recorded to meet the job requirements. |
ASSESSMENT CRITERION RANGE |
Recording of the diagnostic tests can include but is not limited to completing work site checklists, electronic data records, job reports, etc. |
SPECIFIC OUTCOME 4 |
Carry out maintenance and repairs on 3-kV DC regeneration equipment in traction sub-stations. |
OUTCOME RANGE |
Reliable centred maintenance and repair frequencies or manufacturers maintenance schedules or other preventative maintenance and repair frequencies. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Maintaining and repairing of 3-kV DC regeneration equipment in traction sub-stations consistent with manufacturer`s specifications and job requirements. |
ASSESSMENT CRITERION RANGE |
Maintaining and repairing of 3-kV DC regeneration equipment in traction sub-stations can include but is not limited to breaker trucks, Arc chute, control circuits, contactors and resistance banks, as per reliability centered maintenance (RCM), maintenance schedules, etc. |
ASSESSMENT CRITERION 2 |
The maintenance and repair on 3-kV DC regeneration equipment in traction sub-stations is carried out following manufacturer's procedures and worksite instructions. This may include the disassembling or opening of parts of the equipment. |
ASSESSMENT CRITERION RANGE |
The maintenance and repair on 3-kV DC regeneration equipment can include but is not limited to solvent cleaning, visual inspection of components, lubricating, greasing, penetrating oils, cleaning of main and auxiliary contacts, operation adjustments, control and mechanism serviced, manufacturer's procedures, worksite instructions, reliability centered maintenance (RCM), etc. |
ASSESSMENT CRITERION 3 |
All cleaning solvents and materials are used safely and appropriately with the correct personal safety aspects taken into consideration, during maintenance as per manufacturer's specifications and worksite standards. |
ASSESSMENT CRITERION RANGE |
The safe used of solvents and materials can include but is not limited to manufacturer's specifications, worksite standards, etc. |
ASSESSMENT CRITERION 4 |
All tools and equipment are used safely and correctly during maintenance as per manufacturers specifications and worksite standards. |
ASSESSMENT CRITERION RANGE |
Tools and equipment can include but is not limited to general engineering tools, specialised tools, test rig, etc. |
ASSESSMENT CRITERION 5 |
Ensure that all environmental aspects are taken into consideration as per environmental impact studies/management. |
ASSESSMENT CRITERION RANGE |
No defective spares and fastening devices thrown around, cleaning solvent spillage is kept to a minimum, no old or excessive grease spilled on ground. |
SPECIFIC OUTCOME 5 |
Perform function tests and checks on 3-kV DC regeneration equipment in traction sub-stations. |
OUTCOME RANGE |
Operational tests, visual inspections, check sheets. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work party is advised of safe work practices when tests and checks are about to start on 3-kV DC regeneration equipment as per OHSA, Electrical Safety Instructions (ESI), Engineering Instructions (EI) and reliability centered maintenance (RCM). |
ASSESSMENT CRITERION RANGE |
Safe work practices when tests and checks are about to start on 3-kV DC high-speed circuit breaker (HSCB) can include but are not limited to OHSA, Electrical Safety Instructions (ESI), Engineering Instructions (EI) and Reliability Centered Maintenance schedules (RCM), etc. |
ASSESSMENT CRITERION 2 |
All the function tests required are completed to manufacturer's standards and worksite standards. |
ASSESSMENT CRITERION RANGE |
Function tests can include but are not limited to insulation resistance tests, minimum operating voltage, trip tests, auxiliary contact tests, insulation tests, motor functional tests, hi-pot tests, calibration tests, operation time, operational indicators and alarms, etc. |
ASSESSMENT CRITERION 3 |
All the remote operation tests required are completed to manufacturer's standards and worksite standards. |
ASSESSMENT CRITERION RANGE |
Remote operation tests can include but are not limited to initiating indication from control panel or computer, fault alarms, indicators etc. |
ASSESSMENT CRITERION 4 |
All equipment worked on is inspected and set for return to service as per maintenance procedures. |
ASSESSMENT CRITERION RANGE |
3-kV DC regeneration equipment worked on and set for return to service can include but are not limited to breaker trucks, arc chute, control circuits, resistance continuity, as per reliability centered maintenance (RCM), maintenance schedules, etc. |
SPECIFIC OUTCOME 6 |
Complete all tasks on 3-kV DC regeneration equipment in traction sub-stations. |
OUTCOME RANGE |
Maintenance documentation, inspection sheets, test sheets. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The `as found` and `as left` conditions are recorded analysis and reporting of defects, correct completion of the plant and defect history, including replacement spares fitted. |
ASSESSMENT CRITERION RANGE |
The `as found` and `as left` conditions are recorded can include but are not limited to the plant history as per maintenance policy, quality standards, logbooks, job cards, etc. |
ASSESSMENT CRITERION 2 |
Post maintenance and repair clean up process is completed according to industry standards, environmental requirements and site-specific standards. |
ASSESSMENT CRITERION RANGE |
Post maintenance clean up process can include but are not limited to tools, equipment, oils, greases, lubricants, solvents, etc. |
ASSESSMENT CRITERION 3 |
Waste material is disposed of according to site-specific standards and environmental policies and requirements. |
ASSESSMENT CRITERION RANGE |
Waste material can include but are not limited to solvents, waste, rags, scrap/defective parts, etc. |
ASSESSMENT CRITERION 4 |
All tools and equipment is checked, cleaned and return for safe keeping according to work site house keeping procedures and standards. |
ASSESSMENT CRITERION RANGE |
All tools and equipment can include but are not limited to general hand tools, specialised tools, testing equipment, maintenance equipment, etc. |
ASSESSMENT CRITERION 5 |
Other necessary documentation is completed and submitted to designated personnel, as well as all manuals and guidelines are returned for safe keeping as per work site procedures and standards. |
ASSESSMENT CRITERION RANGE |
The safe keeping of manuals and completion of other necessary documentation can include but are not limited to designated personnel, worksite procedures, company specific instructions, standards, etc. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
Learner and societal development:
Learners can understand the importance of: |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO ORGANISING |
Organise oneself and one's activities responsibly and effectively in the ability to follow instructions, regulations when working alone or in a work team, whilst ensuring the safe execution of work activities. |
UNIT STANDARD CCFO COLLECTING |
Collect, evaluate, organise and critically evaluate information related to inspection, testing, maintenance and repairing of regeneration equipment. |
UNIT STANDARD CCFO COMMUNICATING |
Learners can communicate effectively with relevant role-players when receiving or giving instructions to fellow workers, and in the recording and reporting of information. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, showing responsibility towards the environmental and the health of others during inspection, testing, maintenance and repairing of regeneration equipment to ensuring that all safety and environmental conditions are considered. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Supplementary information:
Note: Legal Requirements: Terminology of: The following terms and abbreviations relate to this unit standard: Context Specific: Specific to a discipline or an industry: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 72052 | Further Education and Training Certificate: Electrical Engineering | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | ESKOM GENERATION - PALMIET PUMP STORAGE GRABOUW |
2. | KP ACADEMY (PTY) LTD |
3. | POWER SYSTEMS TRAINING, CAPE TOWN |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |