All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Move equipment by means of an electric winch |
SAQA US ID | UNIT STANDARD TITLE | |||
256776 | Move equipment by means of an electric winch | |||
ORIGINATOR | ||||
SGB Mining and Minerals | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 2 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who are responsible for moving equipment by means of an electric winch.
Learners credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in:
|
UNIT STANDARD RANGE |
N/A |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Demonstrate knowledge relating to the moving of equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The requirements pertaining to a safe, healthy work environment and the consequences of not adhering to the above are explained in terms of specified requirements. |
ASSESSMENT CRITERION 2 |
The importance of moving equipment is explained in terms of achieving production requirements and up- and down stream operational requirements. |
ASSESSMENT CRITERION 3 |
Hazards and associated risks pertaining to the moving of equipment are identified through relevant risk assessment procedures. |
ASSESSMENT CRITERION 4 |
The actions to be taken should hazards and risks be encountered, are explained in terms of specified requirements. |
ASSESSMENT CRITERION 5 |
The principal components of the moving system are identified and their functions explained in terms of operational requirements. |
ASSESSMENT CRITERION RANGE |
Principal components must include the following:
|
ASSESSMENT CRITERION 6 |
Lock-out procedures pertaining to the moving system and the consequences of non-compliance are explained in terms of specified requirements. |
ASSESSMENT CRITERION 7 |
The communication requirements pertaining to the moving operation and the consequences of non-compliance are explained in terms of operational requirements. |
ASSESSMENT CRITERION 8 |
The operating parameters and control methods and the consequences of not adhering to these are explained in terms of operational requirements. |
ASSESSMENT CRITERION 9 |
The factors affecting the optimum performance of the moving system is explained in terms of operational requirements. |
ASSESSMENT CRITERION 10 |
The elementary principles of the moving operation are explained in terms of operational requirements. |
ASSESSMENT CRITERION 11 |
The actions to be taken, should sub-standard conditions and problems be encountered, are explained in terms of operational requirements. |
SPECIFIC OUTCOME 2 |
Prepare to move equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal protective and safety equipment is verified, examined and used in accordance with prescribed practices. |
ASSESSMENT CRITERION 2 |
Tools and equipment are verified and examined in accordance with prescribed practices. |
ASSESSMENT CRITERION 3 |
Workplace hazards and associated risks are dealt with in accordance with recommendations set out in the applicable risk assessment. |
ASSESSMENT CRITERION 4 |
The moving system is examined and substandard conditions are dealt with in accordance with prescribed practices. |
ASSESSMENT CRITERION 5 |
Security requirements pertaining to the moving system are met in accordance with operational requirements. |
ASSESSMENT CRITERION 6 |
Occupational safety and health procedures towards self and others are maintained in terms of specified requirements. |
SPECIFIC OUTCOME 3 |
Move equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal protective and safety equipment is used in accordance with prescribed practices. |
ASSESSMENT CRITERION 2 |
The start-up of the moving system is in accordance with prescribed practices. |
ASSESSMENT CRITERION 3 |
The moving system is started and the process is monitored and controlled in accordance with operational requirements. |
ASSESSMENT CRITERION 4 |
Safe and optimum production is facilitated through effective communication. |
ASSESSMENT CRITERION 5 |
Tools and equipment are used in accordance with prescribed practices. |
ASSESSMENT CRITERION 6 |
The moving system is checked in accordance with the standard plant operating procedures. |
ASSESSMENT CRITERION 7 |
Workplace hazards and associated risks are dealt with in accordance with recommendations set out in the applicable risk assessment. |
ASSESSMENT CRITERION 8 |
Problems encountered are dealt with in accordance with operational requirements. |
ASSESSMENT CRITERION 9 |
Operation of the moving system is conducted consistently with environmental policy and other relevant legislation. |
ASSESSMENT CRITERION 10 |
Occupational safety and health procedures towards self and others are maintained in accordance with specified requirements. |
SPECIFIC OUTCOME 4 |
Complete duties pertaining to the moving process. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The moving system is stopped in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
Personal protective and safety equipment is dealt with in accordance with prescribed practices. |
ASSESSMENT CRITERION 3 |
Tools and equipment are dealt with in accordance with prescribed practices. |
ASSESSMENT CRITERION 4 |
Good housekeeping practices are maintained in accordance with plant instructions. |
ASSESSMENT CRITERION 5 |
Reporting and data-recording requirements are met in accordance with operational requirements. |
ASSESSMENT CRITERION 6 |
Preparation for maintenance is conducted in accordance with company policy. |
ASSESSMENT CRITERION 7 |
Lock-out procedures are adhered to in accordance with specified requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The following embedded knowledge will be assessed in an integrated way in the context of the unit standard.
Knowledge relating to moving equipment by means of an electric winch: Critical factors relating to moving equipment by means of an electric winch: Processes and events relating to moving equipment by means of an electric winch: Causes and effects (Safety and Health): Procedures and techniques relating to moving equipment by means of an electric winch: Regulations, legislation, agreements, policies and standards: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
Note: The learner is able to monitor plant and process conditions, identify anomalies and non-conformances and take appropriate action to resolve the issue with regards to moving equipment by means of an electric winch. |
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team, group, organisation or community.
Note: The learner contributes effectively to teamwork in the mineral processing plant by contributing to team output and adhering to relevant codes of conduct. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
Note: The learner demonstrates the ability to constantly monitor plant and process conditions, record information accurately and interpret plant and process information effectively. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, thus showing responsibility towards the environment and health of others.
Note: The learner interacts confidently with the technology which is used to monitor and control conditions in the minerals processing plant and related systems. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
Note: The learner understands the synergy between upstream, downstream and parallel processes, and his/her own role with regards to moving equipment by means of an electric winch. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Terminology:
Specified requirements include legal and site specific requirements are contained in one or more of the following documents: Legal: Site-Specific: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 62769 | National Certificate: Mineral Processing | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MQA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |