All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Generate hot gas |
SAQA US ID | UNIT STANDARD TITLE | |||
256660 | Generate hot gas | |||
ORIGINATOR | ||||
SGB Mining and Minerals | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 4 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who are responsible for generating hot gas.
People credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in:
|
UNIT STANDARD RANGE |
The following range applies to this unit standard:
Hot gas generation by means of: |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Demonstrate knowledge relating to the generation of hot gas. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The requirements pertaining to a safe, healthy work environment in the hot gas generation process and the consequences of not adhering to the above are explained in terms of specified requirements. |
ASSESSMENT CRITERION 2 |
The importance of hot gas generation is explained in terms of achieving production requirements and downstream operational requirements. |
ASSESSMENT CRITERION 3 |
Hazards and associated risks pertaining to the hot gas generating system are identified through specified risk assessment procedures. |
ASSESSMENT CRITERION 4 |
The actions to be taken should hazards and risks be encountered are explained in terms of operational requirements. |
ASSESSMENT CRITERION 5 |
The principal components of the hot gas generating system are identified and their functions are explained in terms of operational requirements. |
ASSESSMENT CRITERION RANGE |
Principal components must include the following:
|
ASSESSMENT CRITERION 6 |
The actions to be taken, should sub-standard conditions and problems be encountered are explained in terms of operational requirements. |
ASSESSMENT CRITERION 7 |
The lock out procedures pertaining to the hot gas generating system and the consequences of non-compliance are explained in terms of specified requirements. |
ASSESSMENT CRITERION 8 |
The communication requirements pertaining to hot gas generation and the consequences of non-compliance are explained in terms of operational requirements. |
ASSESSMENT CRITERION 9 |
The operating parameters, control methods and factors affecting the performance of the hot gas generator are explained in terms of specified requirements. |
SPECIFIC OUTCOME 2 |
Prepare to generate hot gas. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal protective and safety equipment is verified, examined and used in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
Tools and equipment are verified and examined in accordance with specified requirements. |
ASSESSMENT CRITERION 3 |
Workplace hazards and associated risks are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 4 |
The hot gas generating system is examined and substandard conditions are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 5 |
Occupational safety and health precautions towards self and others are maintained in accordance with specified requirements. |
SPECIFIC OUTCOME 3 |
Generate hot gas. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal protective and safety equipment is used in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
Safe and optimum production is ensured through effective communication. |
ASSESSMENT CRITERION 3 |
The start-up, monitoring and controlling of the hot gas generating system is conducted in accordance with specified requirements. |
ASSESSMENT CRITERION 4 |
Tools and equipment are used in accordance with specified requirements. |
ASSESSMENT CRITERION 5 |
Work related hazards and associated risks are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 6 |
Problems encountered are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 7 |
The gas generation process is consistent with environmental policy and other specified requirements. |
ASSESSMENT CRITERION 8 |
Safety and health precautions towards self and others are maintained in accordance with specified requirements. |
SPECIFIC OUTCOME 4 |
Complete the duties pertaining to the hot gas generation process. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The hot gas generating process is stopped in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
Personal protective and safety equipment is dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 3 |
Tools and equipment are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 4 |
Good housekeeping practices are maintained in accordance with specified requirements. |
ASSESSMENT CRITERION 5 |
Reporting and data recording requirements are met in accordance with operational requirements. |
ASSESSMENT CRITERION 6 |
Preparation for maintenance is conducted in accordance with specified requirements. |
ASSESSMENT CRITERION 7 |
Lock out procedures are adhered to in accordance with specified requirements. |
ASSESSMENT CRITERION RANGE |
Preparation for maintenance must include the following:
|
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The following embedded knowledge will be assessed in an integrated way in the context of the unit standard.
Knowledge relating to generating hot gas: Critical factors relating to generating hot gas: Processes and events relating to generating hot gas: Causes and effects (Safety and Health): Procedures and techniques relating to generating hot gas: Regulations, legislation, agreements, policies and standards: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
Note: |
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team, group, organisation or community.
Note: |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
Note: |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, thus showing responsibility towards the environment and health of others.
Note: |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
Note: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Terminology:
Specified requirements include legal and site specific requirements are contained in one or more of the following documents: Legal: Site-Specific: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 64189 | National Certificate: Metals Production | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Elective | 62769 | National Certificate: Mineral Processing | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MQA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |