SAQA All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.
SOUTH AFRICAN QUALIFICATIONS AUTHORITY 
REGISTERED UNIT STANDARD: 

Sling loads 
SAQA US ID UNIT STANDARD TITLE
12481  Sling loads 
ORIGINATOR
SGB Manufacturing and Assembly Processes 
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY
-  
FIELD SUBFIELD
Field 06 - Manufacturing, Engineering and Technology Manufacturing and Assembly 
ABET BAND UNIT STANDARD TYPE PRE-2009 NQF LEVEL NQF LEVEL CREDITS
Undefined  Regular  Level 2  NQF Level 02 
REGISTRATION STATUS REGISTRATION START DATE REGISTRATION END DATE SAQA DECISION NUMBER
Reregistered  2018-07-01  2023-06-30  SAQA 06120/18 
LAST DATE FOR ENROLMENT LAST DATE FOR ACHIEVEMENT
2024-06-30   2027-06-30  

In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise.  

This unit standard does not replace any other unit standard and is not replaced by any other unit standard. 

PURPOSE OF THE UNIT STANDARD 
Learners in the field of engineering require the skills, values and knowledge reflected in this unit standard.

The learning outcomes in this unit standard also contribute to the exit level outcomes required for the National Certificate in Mechanical Engineering Fitting (NQF level 2) and related qualifications.

Qualifying learners can sling loads safely before allowing load-moving equipment to remove / move the load. They will understand the importance of applying safe slinging techniques and how it is achieved. This will include a basic knowledge of weight determining, determining what load slinging equipment is required, lashing the load, attaching the load to the selected lifting equipment and signalling the lifting equipment operator. 

LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING 
This unit standard has been designed as the start of a progression. It is one of a series of unit standards for maintaining and caring for equipment in the engineering skills area. 

UNIT STANDARD RANGE 
The ranges as indicated under the specific outcomes determine the scope and level of this unit standard.

All work is performed under supervision and according to worksite and manufacturer specifications and occupational safety, health and environmental legislation. 

Specific Outcomes and Assessment Criteria: 

SPECIFIC OUTCOME 1 
Plan and prepare for load slinging activity. 

ASSESSMENT CRITERIA
 

ASSESSMENT CRITERION 1 
1. Load weight and slinging methodology is determined. 
ASSESSMENT CRITERION NOTES 
Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 2 
    2. Loads are safely slung. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 3 
    3. Documents and reports are completed. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 4 
    1. Read and interpret task instruction and worksite procedure. 

    ASSESSMENT CRITERION 5 
    2. Determine the weight of the load and the appropriate slinging methodology accurately. 

    SPECIFIC OUTCOME 2 
    Prepare site and equipment for load slinging. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Load weight and slinging methodology is determined. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 2 
    1. Clear site of personnel. 

    ASSESSMENT CRITERION 3 
    3. Documents and reports are completed. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 4 
    2. Identify and select equipment against the load to be moved. 

    ASSESSMENT CRITERION 5 
    3. Conduct pre-use checks on all equipment to be used. 
    ASSESSMENT CRITERION RANGE 
    Equipment includes wire rope, chain and nylon slings, web belts, turn buckles, shackles and eyebolts.
     

    SPECIFIC OUTCOME 3 
    Sling load. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Attach slinging equipment to loads with or without lifting lugs. 

    ASSESSMENT CRITERION 2 
    2. Loads are safely slung. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 3 
    3. Documents and reports are completed. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 4 
    2. Balance the load and check working clearances timeously and safely. 

    ASSESSMENT CRITERION 5 
    3. Signal the lifting equipment operator. 
    ASSESSMENT CRITERION RANGE 
    Signals include hand, whistle, flags and electronic types.
     

    ASSESSMENT CRITERION 6 
    4. Conduct post-slinging activities. 
    ASSESSMENT CRITERION RANGE 
  • Post slinging activities include cleaning up, processing documentation and reporting load-slinging activities to responsible persons.
  • Documentation includes inspection registers.
     

  • SPECIFIC OUTCOME 4 
    Signal the lifting equipment operator. 
    OUTCOME RANGE 
    Signals include hand, whistle, flags and electronic types. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Load weight and slinging methodology is determined. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 2 
    2. Loads are safely slung. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 3 
    3. Documents and reports are completed. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • SPECIFIC OUTCOME 5 
    Conduct post-slinging activities. 
    OUTCOME RANGE 
  • Post slinging activities include cleaning up, processing documentation and reporting load-slinging activities to responsible persons.
  • Documentation includes inspection registers. 

  • ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Load weight and slinging methodology is determined. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 2 
    2. Loads are safely slung. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 3 
    3. Documents and reports are completed. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • SPECIFIC OUTCOME 6 
    Care for and store load slinging equipment. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Ensure equipment is not damaged. 

    ASSESSMENT CRITERION 2 
    2. Loads are safely slung. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 3 
    3. Documents and reports are completed. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 4 
    2. Problems are timeously communicated to the appropriate role players. 

    ASSESSMENT CRITERION 5 
    3. Correct storage techniques are adhered to. 

    SPECIFIC OUTCOME 7 
    Report on slinging equipment condition. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Equipment operational inspections conform to manufacturer specifications. 

    ASSESSMENT CRITERION 2 
    2. Loads are safely slung. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 3 
    3. Documents and reports are completed.

    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 4 
    2. Documents and reports regarding operations and inspections are clear, accurate and complete. 

    ASSESSMENT CRITERION 5 
    3. Completion of load moving is reported to appropriate personnel. 

    ASSESSMENT CRITERION 6 
    4. Work safely with due care for self, fellow workers, equipment, materials and the environment. 

    ASSESSMENT CRITERION 7 
    5. Incidents and problems related to load slinging. 
    ASSESSMENT CRITERION RANGE 
    Safety includes adhering to safe working loads.
     

    SPECIFIC OUTCOME 8 
    Discuss and explain incidents and problems related to load slinging. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Load weight and slinging methodology is determined. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 2 
    2. Loads are safely slung. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 3 
    3. Documents and reports are completed. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • SPECIFIC OUTCOME 9 
    Work safely with due care for self, fellow workers, equipment, materials and the environment. 
    OUTCOME RANGE 
    Safety includes adhering to safe working loads. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Load weight and slinging methodology is determined. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 2 
    2. Loads are safely slung. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 

  • ASSESSMENT CRITERION 3 
    3. Documents and reports are completed. 
    ASSESSMENT CRITERION NOTES 
    Indicators:
  • Load weight is accurately determined
  • Weight calculation and anticipated slinging methodology is accurately explained
  • Appropriate slinging equipment is selected and cared for
  • Equipment operational inspections conform to manufacturer specifications
  • Slinging methodology is appropriately applied
  • Load is timeously and safely slung and balanced
  • Associated slinging signals are used
  • Equipment is not damaged, no injury occurs to personnel
  • Problems are timeously communicated with the appropriate role-players
  • No delays are caused as a result of poor planning or slinging loads
  • Slinging is carried out in a safe manner in accordance with procedures and applicable legislation
  • Documents and reports are clear, accurate and complete
  • Completion of load moving is reported to appropriate personnel
  • Applicable safety, health and environmental procedures are adhered to

    Understanding confirmed:

    Respond to 'what if' and 'why' questions related to
  • The basic principles of slinging
  • Use and caring of slinging equipment.
  • The reasons for proper care and storage techniques.
  • The fundamentals of determining the load weight, attaching slings and balancing loads
  • The implications of not following safe working procedures

    Explain the implications of not adhering to the sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. 


  • UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS 
    The assessment will be governed by the policies and guidelines of the relevant Education and Training Quality Assurance Body who has jurisdiction over this field of learning. The assessor will be accredited and have a technical qualification in this learning area.

    The learner can be assessed in the language of his/her choice although s/he has to report incidents or conditions to someone else. The learner will be assessed on his/her ability to report in the language commonly used in his/her working environment.

    The learner will be assessed in the workplace but s/he can submit documents, projects, test results and assignments that were not produced in the workplace.

    The learner can be assessed against this unit standard to obtain credits or as part of an integrated assessment for a qualification. 

    UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE 
    1. Names & functions of:
  • Slinging equipment.
  • Task instruction.
  • Typical slinging equipment non-conformances.

    2. Attributes, descriptions, characteristics & properties:
  • Of non-conformances / faults on slinging equipment.
  • Of slinging equipment.

    3. Sensory cues:
  • Sensory cues (what I see, hear, smell, feel) utilised for identifying problems during load slinging activities.

    4. Purpose of:
  • Pre-use inspections.
  • Slinging equipment.
  • Safety checks.
  • Signing off the task instruction.
  • Reporting non-conformances, incidents and problems.

    5. Processes, events, causes and effects, implications:
  • Implications of non-conformance.
  • Causes and responses to common problems.
  • Implications and consequences of situations such as e.g. poor quality, damaged or faulty equipment.

    6. Procedures and techniques:
  • Posture during slinging equipment usage.
  • Accurate load weight determining.
  • Safe slinging.
  • Using slinging equipment in adverse conditions.
  • Signalling load moving equipment operator.
  • Slinging equipment caring for and storing procedure.
  • Recording and reporting procedures.

    7. Regulations, legislation, agreements, policies, standards:
  • Applicable safety, health and environmental protection legislation.
  • Applicable company policies and procedures.

    8. Theory: rules, principles, laws:
  • Determining load weight.
  • Safe slinging.
  • Load balancing.
  • Selecting the appropriate slinging equipment for any given load.

    9. Relationships, systems:
  • Relationship between the load, the shape and size of the load and the selected slinging equipment and methodology. 

  • UNIT STANDARD DEVELOPMENTAL OUTCOME 
    N/A 

    UNIT STANDARD LINKAGES 
    N/A 


    Critical Cross-field Outcomes (CCFO): 

    UNIT STANDARD CCFO IDENTIFYING 
    Identify and solve problems.
  • Related to the slinging of loads. 

  • UNIT STANDARD CCFO WORKING 
    Work effectively with others as a member of a team.
  • Interact with colleagues and team members in order to acquire the required slinging equipment. 

  • UNIT STANDARD CCFO ORGANISING 
    Organise and manage my activities and myself.
  • Apply the correct procedures and techniques for slinging the load.
  • Manage resources and my time. 

  • UNIT STANDARD CCFO COLLECTING 
    Collect, analyse, organise and critically evaluate information.
  • Interpret information off job instructions to sling correct loads.
  • Make decisions based on that information. 

  • UNIT STANDARD CCFO COMMUNICATING 
    Communicate effectively.
  • Report condition of slinging equipment. 

  • UNIT STANDARD CCFO DEMONSTRATING 
    Demonstrate an understanding of the world as a set of related systems.
  • Understand and explain the purpose of load slinging in the maintenance process.
  • Justify my actions as appropriate. 

  • UNIT STANDARD ASSESSOR CRITERIA 
    N/A 

    REREGISTRATION HISTORY 
    As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. 

    UNIT STANDARD NOTES 
    N/A 

    QUALIFICATIONS UTILISING THIS UNIT STANDARD: 
      ID QUALIFICATION TITLE PRE-2009 NQF LEVEL NQF LEVEL STATUS END DATE PRIMARY OR DELEGATED QA FUNCTIONARY
    Core  49402   National Certificate in Steel Tube and Pipe Manufacturing (Seamless Hot-Finished OR Welded OR Cold-Formed)  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2012-06-30  MERSETA 
    Core  58269   National Certificate: Electro-Mechanics  Level 2  NQF Level 02  Reregistered  2021-06-30  As per Learning Programmes recorded against this Qual 
    Core  22869   National Certificate: Engineering Fabrication  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2007-08-16  MERSETA 
    Core  58722   National Certificate: Engineering Fabrication  Level 2  NQF Level 02  Reregistered  2021-06-30  As per Learning Programmes recorded against this Qual 
    Core  66512   National Certificate: Foundry Operations  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2013-11-07  MERSETA 
    Core  23273   National Certificate: Mechanical Engineering: Fitting  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2008-06-25  MERSETA 
    Core  23254   National Certificate: Mechanical Engineering: Fitting and Machining  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2008-06-25  MERSETA 
    Core  60169   National Certificate: Water and Wastewater Reticulation Services  Level 2  NQF Level 02  Reregistered  2023-06-30  EWSETA 
    Elective  65809   National Certificate: Automotive Manufacturing and Assembly  Level 2  NQF Level 02  Reregistered  2023-06-30  MERSETA 
    Elective  74530   National Certificate: Measurement, Control and Instrumentation  Level 2  NQF Level 02  Reregistered  2021-06-30  As per Learning Programmes recorded against this Qual 
    Elective  48695   National Certificate: Measurement, Control and Instrumentation  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2009-04-08  Was EWSETA until Last Date for Achievement 
    Elective  59689   National Certificate: Mechanical Engineering  Level 2  NQF Level 02  Reregistered  2021-06-30  As per Learning Programmes recorded against this Qual 
    Elective  58718   National Certificate: Metals Processing  Level 2  NQF Level 02  Reregistered  2023-06-30  MERSETA 
    Elective  36154   National Certificate: Polymer Composite Fabrication  Level 2  NQF Level 02  Reregistered  2023-06-30  MERSETA 
    Elective  58781   National Certificate: Production Technology  Level 2  NQF Level 02  Reregistered  2023-06-30  MERSETA 
    Elective  50542   National Certificate: Small Craft Construction  Level 2  NQF Level 02  Passed the End Date -
    Status was "Registered" 
    2009-08-31  Was MERSETA until Last Date for Achievement 
    Elective  24215   National Certificate: Thermoplastic Fabrication  Level 2  NQF Level 02  Reregistered  2023-06-30  MERSETA 
    Elective  59017   National Certificate: Tissue Conversion  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2015-06-30  FPMSETA 
    Elective  61809   National Certificate: Tyre Repair and Maintenance  Level 2  NQF Level 02  Reregistered  2023-06-30  MERSETA 
    Elective  77003   National Certificate: Yacht and Boat Building  Level 2  NQF Level 02  Reregistered  2023-06-30  MERSETA 
    Elective  58720   National Certificate: Engineering Fabrication  Level 3  NQF Level 03  Reregistered  2021-06-30  As per Learning Programmes recorded against this Qual 
    Elective  64829   National Certificate: Lifting Machine Operations  Level 3  NQF Level 03  Reregistered  2023-06-30  TETA 


    PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: 
    This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here.
     
    1. AAH Skills and Development 
    2. ADVISOR PROGRESSIVE COLLEGE 
    3. Africa International Training Facilities T/A AITF (BREDELL) (TP) 
    4. AGB MATHE BUSINESS SERVICES 
    5. Almel Training 
    6. AMBROSER SOLUTIONS (PTY) LTD 
    7. ArcelorMittal South Africa Ltd (VANDERBIJLPARK) (TP) 
    8. BALOMAT SKILLS TRAINING ACADEMY 
    9. Barloworld South Africa (Pty) Ltd T/A Barloworld-Equipment (ISANDO) (T 
    10. Beekman Super Canopies (STIKLAND) (TP) 
    11. Belique Training Centre cc (ALBERTON) (TP) 
    12. BELMET TRAINING CENTRE T/A BELMET MARINE (PTY) LTD (Bellville)(TP) 
    13. Bevline Mechanical Projects (Pty) Ltd (PROSPECTON) (TP) 
    14. Blue Horison Properties 53 (Pty) Ltd T/A Durnacol Skills Innovation Hu 
    15. BMW SA (Pty) Ltd (ROSSLYN) (TP) 
    16. Bridgestone South Africa (Pty) Ltd - Isando Branch (ISANDO) (TP) 
    17. Career Pathing Solutions (Pty) Ltd (KRUGERSDORP) (TP) 
    18. CATAGRICT IMPRIMERE 
    19. Chupheme Logistix 
    20. Coastal Kzn F.E.T. College - Swinton Road Campus 
    21. Coastal Kzn F.E.T. College - Umbumbulu Campus 
    22. College of Production Technology 
    23. CREATIVE FOUNDATION TRAINING 
    24. Customised Training Specialists Trust T/A CTS (PINETOWN) (TP) 
    25. D&D Lwazi Development Institute 
    26. DONNYBROOK EDUCATION AND TRAINING COLLEGE 
    27. Dynalift cc 
    28. Eastcape Midlands Public FET College - Uitenhage (High Street)Campus 
    29. Eastcape Training Centre 
    30. EECTRICAL CONTRACTORS ASSOCIATION - ECA 
    31. EMINENCE BUSINESS SOLUTIONS (PTY) LTD 
    32. Enstra Learning and Development Centre (Pty) Ltd (SPRINGS) (TP) 
    33. ESKOM DISTRIBUTION NORTH WESTERN REGION, BLOEMFONTEIN 
    34. ESKOM KOEBERG NUCLEAR PPS - FITTER, FITTER & TURNER AND TTC 
    35. False Bay Public FET College - Westlake Campus 
    36. Foundation For People Centred Development 
    37. Gijima AST Holdings (Pty) Ltd T/A Fundi Training Centre (BENONI) (TP) 
    38. He and She Driver Training Centre 
    39. HIZONEX PTY LTD 
    40. HT MARKTECH 
    41. HV Consultants (Pty) Ltd (PORT ELIZABETH) (TP) 
    42. Hytec Group of Companies T/A Hytec (KEMPTON PARK) (TP) 
    43. ILINGE LABANTU TRAINING INSTITUTE 
    44. IMPILONHLE TRADING & PROJECTS 8 
    45. INFINITE DIMENSION CONSULTING 
    46. INFRASTRUCTURE CONSULTING ENGINEERS CC 
    47. Institute for Telling Development T/A ITD Training (MENLYN PARK) (TP) 
    48. IQRAAM DEVELOPMENT CONSULTANCY (PTY) LTD 
    49. ISHUMI LAMASHANDU TRADING 
    50. Izizwe Training Centre (Pty) Ltd T/A Simtech Training (NORTHDENE) (TP) 
    51. Jericho Safety Consultants (Pty) Ltd (TP) 
    52. JESUA CONSULTANTS (Hartenbos) (WA) 
    53. Jesua Consultants (Pty) Ltd (MOSSEL BAY) (TP) 
    54. JOSMAP TRAINING INSTIUTE 
    55. KGOLO INSTITUTE 
    56. LANTHIE CHEMZ DISTRIBUTORS (PTY) LTD 
    57. Lapace Training Centre (SPRINGS) (TP) 
    58. Learning Exchange Pty (Ltd) 
    59. Lesedi Skills Academy (TP) 
    60. Licence Wise 
    61. MacSteel Services Centres SA (WADEVILLE) (TP) 
    62. MACT BUSINESS HUB 
    63. Majuba FET College - Newcastle Technology Centre 
    64. MAKHOKA SUPPLIERS (PTY) LTD 
    65. Mercedes Benz South Africa (Pty) Ltd (EAST LONDON) (TP) 
    66. MILNEX - BALFOUR 
    67. MMESELANE CONSTRUCTION 
    68. Mopani South East FET College - Phalaborwa Campus 
    69. MOVING AHEAD DEVELOPMENT AGENCY 
    70. MPUMAMANZI ACADEMY (PTY) LTD 
    71. MPUMELELO CONSULTANCY CC 
    72. MSC Artisan Academy (Pty) Ltd T/A Master Artisan Academy SA (EAST LOND 
    73. MT & HR Training Consultants (Pty) Ltd (DURBAN) (TP) 
    74. Mthetana Trading & Construction T/A Multi Skill Training Centre (DURBA 
    75. Nissan SA (Pty) Ltd (ROSSLYN) (TP) 
    76. NKANYEZI FOUNDATION 
    77. Northlink College - Bellville Campus 
    78. Northlink College - Wingfield Campus 
    79. NTLEMO PROJECTS 
    80. OPTIMUM LEARNING TECHNOLOGIES PTY LTD 
    81. Orbit FET College - Rustenburg Campus 
    82. Organisational Development International (TP) 
    83. PERSEVCON CONSTRUCTION PTY LTD 
    84. PHAKGAMANG MATSIANA BUSINESS ENTERPRISE 
    85. Plastics Federation of South Africa (MAITLAND) (TP) 
    86. Plastics Federation of South Africa (MIDRAND) (TP) 
    87. Plastics Federation of South Africa (WESTMEAD) (TP) 
    88. PRAXIS TRAINING AND CONSULTANCY (PTY) LTD 
    89. Production Management Institute 
    90. Production Management Institute of Southern Africa (PMI) 
    91. Production Management Institute of Southern Africa (PMI) - Johannesburg 
    92. Production Management Institute of Southern Africa - Durban 
    93. PRODUCTION MANAGEMENT INSTITUTE SA PTY LTD (PORT ELIZABETH) 
    94. PROFESSIONAL DEVELOPMENT AND TRAINING INSTITUTE (PTY) LTD 
    95. PTDEV (PTY) LTD 
    96. QTE Training & Consulting cc T/A QTE (GERMISTON) (TP) 
    97. RAND WATER ZWARTKOPJIES TRAINING CENTRE 
    98. Rema Tip Top SA (Pty) Ltd (BENONI) (TP) 
    99. RENKALEC TRAINING CENTRE 
    100. RONNELS CONSTRUCTION PTY LTD 
    101. S & S Training & Construction (SPRINGS) (TP) 
    102. Sabela Learning Academy 
    103. Scaw Metals Group (Pty) Ltd T/A Scaw Metals (DINWIDDIE) (TP) 
    104. Sedibeng Artisan Skills Training Centre (VEREENIGING) (TP) 
    105. SEDIBENG TRAINING CENTRE 
    106. Shine The Way 281 cc T/A Industrial Training Centre (NEW GERMANY) (TP) 
    107. Shukela Training Centre 
    108. SIYAPHAMBILI DHN PROJECTS 
    109. Skills Priority 
    110. SKILLS TRAINING RESOURCES GROUP 
    111. SOUTH AFRICA ADVANCED SKILLS INSTITUTE 
    112. SOUTH AFRICAN INSTITUTE OF RENEWABLE ENERGY (PTY) LTD 
    113. SOUTH AFRICAN MATRIC EDUCATIONAL CENTERS 
    114. SOUTHERN AFRICAN YOUTH MOVEMENT 
    115. SSS Sheet Metal Work cc T/A Sheetech SA (DURBAN) (TP) 
    116. Steinmuller Africa (Pty) Ltd T/A Steinmuller Technical Training Academ 
    117. TAG TEC TRAINING 
    118. TALENT SCULPTURE ACADEMY 
    119. THE NEW RECLAMATION GROUP (PTY) LTD (Prospecton) (TP) 
    120. THE SAJ COMPETENCY TRAINING INSTITUTE CC 
    121. The Skills College for Development & Training cc (PRETORIA) (TP) 
    122. The Skills Matrix 
    123. Tourism & Business Institute of Southern Africa 
    124. Toyota Academy Toyota SA Motors (Pty) Ltd (ISIPINGO) (TP) 
    125. Training Force (Pty) Ltd 
    126. Training Force (Pty) Ltd (Durban) (TP) 
    127. Transvaal Training 
    128. TRENTYRE (Spartan)(TP) 
    129. TSEBO KITSO TRAININGS 
    130. TSHIKAMOTHA TRADING AND TRAINING 
    131. Umfolozi FET College 
    132. Umfolozi FET College - Central Office 
    133. Umfolozi FET College - Mandeni Campus 
    134. Umgungundlovu FET College - Plessislaer Campus 
    135. Volkswagen of South Africa (Pty) Ltd - Technical Learning Academy (UIT 
    136. Wavelength T.T.I 
    137. West Coast Public FET College - Vredenburg Campus 
    138. WESTERN COLLEGE FOR WESTCOL 
    139. Wheelman S A 
    140. Wide Horizon Advanced Training (PORT ELIZABETH) (TP) 
    141. Wilbat Projects 148 (Pty) Ltd (ISIPINGO) (TP) 
    142. World Focus 382 cc T/A Richards Bay Technical Training & Assessment Centre (ZCBF) (RICHARDS BAY) (TP) 
    143. YN2 TRADING AND PROJECTS 
    144. Zeta Training Solutions 



    All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.