All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Execute train movement procedures |
SAQA US ID | UNIT STANDARD TITLE | |||
264384 | Execute train movement procedures | |||
ORIGINATOR | ||||
SGB Rail and Pipeline Operations | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 11 - Services | Transport, Operations and Logistics | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 6 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
14618 | Execute departure/arrival/en route travelling procedures - train personnel | Level 3 | NQF Level 03 | 3 | |
14621 | Perform crossing of trains | Level 3 | NQF Level 03 | 3 |
PURPOSE OF THE UNIT STANDARD |
A learner will be able to perform the safety procedures for departure, arrival, en route travelling and crossing of trains, according to company-specific train working rules to contribute to the safety of personnel, passengers or freight and safe movement on rail.
The qualifying learner will be capable of: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that a learner is competent in:
|
UNIT STANDARD RANGE |
N/A |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Perform procedures and inspections before departure of trains from stations/yards. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The train roadworthy inspection is described in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION 2 |
The departure procedures are explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION 3 |
The train departure procedures are executed in accordance with organisational standards and Procedures. |
ASSESSMENT CRITERION 4 |
Faults identified are corrected and/or reported in accordance with organisational procedures. |
SPECIFIC OUTCOME 2 |
Perform en route safety procedures. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The en route safety procedures are explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION 2 |
The en route safety procedures are executed in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION 3 |
The required response to abnormalities is explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION RANGE |
Abnormalities include but are not limited to veld fires, rolling stock defects, signal and indicator defects. |
ASSESSMENT CRITERION 4 |
The required response to signals and indicators are described in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION 5 |
Faults identified are corrected and/or reported in accordance with organisational procedures. |
SPECIFIC OUTCOME 3 |
Perform duties at railway line crossing places. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1 The admittance procedures of first, only and opposing train(s) at a crossing place are explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION RANGE |
Admittance procedures include but are not limited to methods of train control, inspection of points, signals and indicators. |
ASSESSMENT CRITERION 2 |
The admittance procedures of first and only train(s) at a crossing place are executed in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION RANGE |
Admittance procedures include but are not limited to methods of train control, inspection of points, signals and indicators. |
ASSESSMENT CRITERION 3 |
The admittance procedure of an opposing train at a crossing place is executed in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION 4 |
The in crossing place procedures are explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION RANGE |
In crossing place procedures include but are not limited to inspection of train, observing of passing train(s), operating of train equipment, setting of points, admittance of opposing train/s. |
ASSESSMENT CRITERION 5 |
The in crossing place procedures are executed in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION RANGE |
In crossing place procedures include but are not limited to inspection of train, observing of passing train(s), operating of train equipment, setting of points, admittance of opposing train/s. |
ASSESSMENT CRITERION 6 |
The departure procedures of first, only and opposing trains out of a crossing place are explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION RANGE |
Departure procedures include but are not limited to verification of token, setting of points, setting of indicators and securing of points. |
ASSESSMENT CRITERION 7 |
The departure procedures of first or only train out of a crossing place are explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION RANGE |
Departure procedures include but are not limited to verification of token, setting of points, setting of indicators and securing of points. |
ASSESSMENT CRITERION 8 |
The departure procedures of an opposing train(s) out of a crossing place are explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION RANGE |
Departure procedures include but are not limited to verification of token, setting of points, setting of indicators and securing of points. |
SPECIFIC OUTCOME 4 |
Perform arrival procedures at destinations. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Arrival procedures at destination are explained in accordance with organisational standards and procedures. |
ASSESSMENT CRITERION 2 |
Arrival procedures are executed in accordance with organisational standards and procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems related to performing train personnel travelling procedures in which responses display that critical thinking is used for responsible decision making. |
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a railway team to execute arrival and departure procedures at stations/yards. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and one's activities responsibly and effectively in performing all duties during departure, en route and arrival procedures. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information train movement in order to perform train personal travelling duties. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively using appropriate modes of oral and/or written persuasion in dealing with all role-players to perform travelling functions on time and to standards. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard replaces the following unit standards:
|
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49795 | National Certificate: Rail Construction and Maintenance | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
Elective | 66709 | National Certificate: Rail Operations (Functional Yard Operations) | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |