All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain programmable field instruments |
SAQA US ID | UNIT STANDARD TITLE | |||
262482 | Maintain programmable field instruments | |||
ORIGINATOR | ||||
SGB Generic Manufacturing, Engineering, Technology | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Engineering and Related Design | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 12 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
114612 | Maintain pressure equipment | Level 3 | NQF Level 03 | 7 |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Manufacturing Engineering and Technology field.
A person credited with this unit standard will be able to: This unit standard will contribute to the full development of the learner within the Measurement Control and Instrumentation environment by providing recognition, further mobility and transportability within the field of Manufacturing Engineering and Technology. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the Measurement Control and Instrumentation environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and/or equivalent:
|
UNIT STANDARD RANGE |
For the purposes of this unit standard:
|
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and prepare to isolate and de-isolate programmable field instruments. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Job requirements are correctly interpreted according to instructions and/or instrumentation diagrams. |
ASSESSMENT CRITERION 2 |
Tools and equipment are selected according to job requirements. |
ASSESSMENT CRITERION 3 |
The location for the isolation of programmable field instruments is identified in accordance with workplace procedures. |
ASSESSMENT CRITERION 4 |
Authorisation for access to restricted areas is obtained from the relevant personnel. |
ASSESSMENT CRITERION 5 |
The correct safety equipment and material required is obtained from the appropriate sources. |
ASSESSMENT CRITERION 6 |
The working schedule is effectively communicated to all affected parties. |
SPECIFIC OUTCOME 2 |
Isolate and remove programmable field instruments. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The area where isolation is to be carried out is prepared for the isolation procedure in accordance with workplace procedures. |
ASSESSMENT CRITERION 2 |
The correct tools are selected and used according to the job requirements. |
ASSESSMENT CRITERION 3 |
Programmable Field Instrumentation and electrical equipment is identified and isolated according to organisational isolation procedures. |
ASSESSMENT CRITERION 4 |
All safety precautions are adhered to before, during and after the isolation and removal procedure. |
ASSESSMENT CRITERION 5 |
The equipment is removed in accordance with manufacturer recommended procedures. |
SPECIFIC OUTCOME 3 |
Calibrate programmable field instruments. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Tools, equipment and data required are identified for the calibration procedure in accordance with workplace procedures. |
ASSESSMENT CRITERION 2 |
The correct tools are selected and used according to the job requirements. |
ASSESSMENT CRITERION 3 |
The calibration and testing equipment and instrumentation is prepared for the calibration process in accordance with manufacturer specifications. |
ASSESSMENT CRITERION 4 |
The programmable field instruments are calibrated within the tolerances specified by the manufacturer's calibration manuals. |
ASSESSMENT CRITERION 5 |
The calibration sheets and associated documentation is completed in accordance with workplace procedures. |
SPECIFIC OUTCOME 4 |
Install and commission programmable field instrumentation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The programmable field instruments are installed in the correct location as per Measurement, Control and Instrumentation drawing. |
ASSESSMENT CRITERION 2 |
The programmable field instruments and electrical equipment are de-isolated and commissioned in accordance with workplace procedures. |
ASSESSMENT CRITERION 3 |
All safety precautions are adhered to before, during and after the installation, de-isolation and commissioning process. |
ASSESSMENT CRITERION 4 |
The operation of the programmable field instrumentation is verified to be in accordance with the workplace operating instructions and Instrumentation drawings (sketches and flow diagrams). |
SPECIFIC OUTCOME 5 |
Establish normal conditions after maintenance of programmable field instrumentation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The waste is disposed of according to workplace and manufacturer instructions, taking environmental awareness into account. |
ASSESSMENT CRITERION 2 |
All tools and equipment are checked, cleaned and correctly stored according to workplace and manufacturer procedures. |
ASSESSMENT CRITERION 3 |
The workplace is restored to original state according to housekeeping standards and work site procedures. |
ASSESSMENT CRITERION 4 |
All documentation is accurately completed and filed or submitted to the relevant personnel. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identification and problem solving skills - faulty equipment identified and reported. |
UNIT STANDARD CCFO WORKING |
Work effectively with others - working under supervision. |
UNIT STANDARD CCFO COMMUNICATING |
Communication skills - reporting faulty programmable field instrumentation and interpreting job requirements. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, showing responsibility towards the environment and health of others - applied when maintaining programmable field instrumentation. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard replaces unit standard 114612, "Maintain pressure equipment", Level 3, 7 credits. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 74532 | National Certificate: Measurement, Control and Instrumentation | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |