All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Manage a railway control centre |
SAQA US ID | UNIT STANDARD TITLE | |||
262337 | Manage a railway control centre | |||
ORIGINATOR | ||||
SGB Transport and Logistics Operations | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 11 - Services | Transport, Operations and Logistics | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 16 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
A learner credited with this unit standard will have the ability to direct the rail traffic from the railway control centre during normal and degraded mode.
Learners will be able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in:
|
UNIT STANDARD RANGE |
N/A |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Start and end railway control centre operations. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The process to "log in" the computer program is conducted in accordance with company standards and procedures. |
ASSESSMENT CRITERION 2 |
The process to load a timetable in the computer system is conducted in accordance with company standards and procedures. |
ASSESSMENT CRITERION 3 |
Tests for the equipment indications (setting up or cancellation process) are explained and conducted in accordance with manufacturer's and company standards and procedures. |
ASSESSMENT CRITERION RANGE |
Equipment indications include but are not limited to routes, points locking, and signals. |
ASSESSMENT CRITERION 4 |
The extent, purpose and location of all local and remote transmission equipment and communication links to the control traffic centre system are described according to organisational operational requirements. |
SPECIFIC OUTCOME 2 |
Set up routes for the movement of trains on signalling system. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Rail movement information is collated for the generation of the routes in accordance with the timetable. |
ASSESSMENT CRITERION 2 |
Routes are generated in accordance with the system requirement. |
ASSESSMENT CRITERION 3 |
Reasons why generated routes are not set up on the system are explained in terms of function and failure. |
ASSESSMENT CRITERION 4 |
Planned movements are communicated and agreed upon with neighbouring stations and drivers. |
SPECIFIC OUTCOME 3 |
Manage the train authority in case of incidents. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Different methods and orders given to the driver are explained to catch-up the delay in accordance with company standards and procedures. |
ASSESSMENT CRITERION 2 |
Instructions given to the driver and control centre process are explained in case of train overrunning in station platform in accordance with company standards and procedures. |
ASSESSMENT CRITERION 3 |
Instructions given to the driver and control centre process are explained for Signal Passing At Danger (SPAD) () in accordance with company standards and procedures. |
SPECIFIC OUTCOME 4 |
Manage the failure of equipment. |
OUTCOME RANGE |
Failure of equipment includes but is not limited to track circuit occupied, loose of point's detection, signals. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Movement during failure of equipment is authorised in accordance with company standards and procedures. |
ASSESSMENT CRITERION 2 |
The consequences of equipment failures are explained in terms of the impact on train movement. |
ASSESSMENT CRITERION 3 |
The equipment failures are reported to technical support personnel according to organisational operational requirements. |
ASSESSMENT CRITERION 4 |
The maintenance strategy is explained in accordance with the organisational quality management system. |
SPECIFIC OUTCOME 5 |
Manage train movements according to service requirements during degraded circumstances. |
OUTCOME RANGE |
Degraded circumstances include but are not limited to big delay, train failure; station closed, emergency situations, loss of control centre control. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Train movements are rearranged according to service requirements during degraded circumstances. |
ASSESSMENT CRITERION 2 |
Access to support contact people is explained using examples. |
ASSESSMENT CRITERION 3 |
Management of emergency situations with EMS, Staff, and third parties are demonstrated in accordance with company standards and procedures. |
ASSESSMENT CRITERION 4 |
An incident report is compiled in accordance with company policies and procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
N/A |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Problem solving:
|
UNIT STANDARD CCFO WORKING |
Teamwork:
|
UNIT STANDARD CCFO ORGANISING |
Self-organisation and self-management:
|
UNIT STANDARD CCFO COLLECTING |
Information evaluation:
|
UNIT STANDARD CCFO COMMUNICATING |
A learner has acquired the generic ability to communicate effectively by using visual and/or audible language skills in oral and/or written form (when authority must be obtained from another source). |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically:
|
UNIT STANDARD CCFO DEMONSTRATING |
Inter relatedness of systems:
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
POSMOR in this unit standard refers to Principles of Safe Movement on Rail. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 65589 | Further Education and Training Certificate: High Speed Inter-City Commuter Railway Operations | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |