All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain steam traps |
SAQA US ID | UNIT STANDARD TITLE | |||
253599 | Maintain steam traps | |||
ORIGINATOR | ||||
SGB Generic Manufacturing, Engineering, Technology | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 4 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
Learners in the field of mechanical installation and engineering maintenance, require the skills, values and knowledge reflected in this unit standard.
The learning outcomes in this unit standard also contribute to the exit level outcomes required for related qualifications. Qualifying learners are able to: This unit standard would be assessed in the context of: The skills, knowledge and values reflected in this unit standard form part of the Exit Level Outcomes required for the National Certificate in Mechanical Engineering (Fitting) or (Pipe-Fitting): NQF Level 3 or 4. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
This unit standard is one of a series of unit standards associated with flow control equipment and related maintenance to be performed by learners in the field of mechanical fitting.
The credits allocated to this unit standard assume that a learner has already learned to: |
UNIT STANDARD RANGE |
For the purpose of assessment, steam traps may be selected from a range which includes:
Applications include but are not limited to any one of the following: Environment contexts include but are not limited to: The learner should be able to: |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Identify and discuss the applications of steam traps. |
OUTCOME NOTES |
The need for steam traps, considerations surrounding their operation, basic modes of operation and relevant standards are all to be assessed in this outcome, by identifying, discussing and explaining:
|
OUTCOME RANGE |
Understanding confirmed:
Respond to `what if` and `why` questions covering: |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The classifications and types of steam traps are identified and discussed. |
ASSESSMENT CRITERION NOTES |
Identification includes:
|
ASSESSMENT CRITERION 2 |
The applications and the distinct features and characteristics of various types of steam traps are explained. |
ASSESSMENT CRITERION 3 |
Maintenance procedures are discussed and explained in terms of worksite practice and manufacturers specifications. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 4 |
The terminology used when explaining and discussing steam traps, is in keeping with manufacturer and worksite norms and standards. |
ASSESSMENT CRITERION RANGE |
Understanding confirmed:
Respond to `what if` and `why` questions covering: |
SPECIFIC OUTCOME 2 |
Plan and prepare for the maintenance of steam trap/s. |
OUTCOME RANGE |
Planning and preparation includes reading and understanding task instructions engineering drawings and shut-down scheduling, identification of the equipment to be maintained, obtaining maintenance schedules and manufacturer specifications for specific equipment to be maintained. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The planning and preparation for the maintenance repair and/or removal of the steam trap/s is explained, in accordance with work instructions. |
ASSESSMENT CRITERION 2 |
Shut-down procedures are explained and performed according to plant procedures, in order to remove the steam trap. |
ASSESSMENT CRITERION 3 |
Site and equipment are prepared for steam trap maintenance, repair and/or installation. |
ASSESSMENT CRITERION 4 |
The steam trap/s are inspected and assessed for its work requirements in terms of maintenance, repair and/or removal. |
ASSESSMENT CRITERION RANGE |
The evaluation of a faulty steam trap includes checking for leaking steam or the blockage of flow. |
ASSESSMENT CRITERION 5 |
Maintenance equipment and resources are correct for the task, available on site by the agreed time, and checked for serviceability in accordance with regulatory and worksite practices. |
ASSESSMENT CRITERION RANGE |
Resources include personnel requirements, tools, equipment, vehicle/s for transport and mechanical handling, support materials, applicable documentation and personal protective equipment. |
ASSESSMENT CRITERION 6 |
Where required, handling space is cleared, potential obstructions are removed and personnel are notified, prior to the maintenance, repair and/or removal task. |
ASSESSMENT CRITERION 7 |
Pre-operational checks are carried out on removal and securing equipment, in accordance with work instructions. |
ASSESSMENT CRITERION NOTES |
Indicators:
|
SPECIFIC OUTCOME 3 |
Maintain steam trap/s. |
OUTCOME RANGE |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The steam trap is maintained in compliance with operational requirements. |
ASSESSMENT CRITERION 2 |
The steam trap is tested for conformance within operational requirements and according to manufacturer's specifications. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 3 |
Work area is restored to a safe and serviceable condition. |
ASSESSMENT CRITERION 4 |
All work is performed safely with due care for self, fellow workers, machines, equipment, materials and environment. |
ASSESSMENT CRITERION 5 |
Steam trap condition is recorded and reported. |
ASSESSMENT CRITERION NOTES |
Indicators:
|
SPECIFIC OUTCOME 4 |
Care for and store system maintenance tools and equipment. |
OUTCOME RANGE |
Tools and equipment include absorbent material, hand tools and cleaning equipment, fluids, lifting equipment and tackle. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The proper care and storage procedures for tools and equipment are explained in accordance with work site practices and specifications. |
ASSESSMENT CRITERION 2 |
Work area is restored to a safe and serviceable condition. |
ASSESSMENT CRITERION 3 |
Tools, equipment, lifting equipment and tackle is stored in accordance with manufacturer's specification and requirements. |
ASSESSMENT CRITERION 4 |
Malfunctioning tools and equipment is reported and the necessary arrangements for the repair thereof is made according to accepted worksite practice. |
ASSESSMENT CRITERION NOTES |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Names and functions of:
Attributes, descriptions, characteristics and properties: Sensory cues: Purpose of: Processes, events, causes and effects, implications: Procedures and techniques: Regulations, legislation, agreements, policies, standards: Theory: Rules, principles, laws: Relationships, systems: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems:
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team:
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage my activities and myself:
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information:
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively:
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically:
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems:
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
The term "maintain" is defined as inspect, determine faults, assess requirements for repair, remove, replace, repair, adjust, re-align, seat components, reassemble, install and test.
Notes to Assessors: Assessors should keep the following general principles in mind when designing and conducting assessments against this unit standard: Recognition of Prior Learning: Credits may be obtained by applying to an accredited/approved training provider/institution in order to have prior learning recognised in lieu of work experience. Work experience must relate to the specific outcomes contained within this unit standard. The ensuing assessment of candidates seeking recognition of prior learning should not be so onerous as to deter them from doing so. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 59750 | National Certificate: Mechanical Engineering: Pipe-Fitting | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Elective | 59769 | Further Education and Training Certificate: Mechanical Engineering: Pipe-Fitting | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |