All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Perform load following on electrical transmission systems |
SAQA US ID | UNIT STANDARD TITLE | |||
242775 | Perform load following on electrical transmission systems | |||
ORIGINATOR | ||||
SGB Power Plant Operations | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Engineering and Related Design | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 5 | Level TBA: Pre-2009 was L5 | 15 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The person credited with this unit standard is able to perform load following, monitor system conditions, control abnormal system conditions and operate Automatic Generation Control (AGC). |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in:
|
UNIT STANDARD RANGE |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Perform load following. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Load following is performed according to statutory requirements, system operating guidelines and procedures. |
ASSESSMENT CRITERION RANGE |
Southern African Power Pool agreements, Eskom Power Pool market rules and Ancillary Service contracts. |
ASSESSMENT CRITERION 2 |
Schedule program is obtained and utilised according to guidelines and procedures. |
ASSESSMENT CRITERION 3 |
Actual and available generating capacity is confirmed against schedule program. |
ASSESSMENT CRITERION 4 |
Adjustments performed hourly according to schedule program. |
ASSESSMENT CRITERION 5 |
Adjustments to rectify deviation from scheduled program is performed according to reserve market merit order, regulations and procedures. |
ASSESSMENT CRITERION 6 |
Area Control Error (ACE) is monitored and controlled within parameters. |
ASSESSMENT CRITERION 7 |
Hydro and gas turbine unit operations performed in accordance with system operating guidelines and procedures. |
ASSESSMENT CRITERION 8 |
Reserves are monitored in accordance to operating procedures/requirements. |
ASSESSMENT CRITERION RANGE |
Ten minute reserve, regulating reserve, instantaneous reserve and emergency reserve and supplemental reserves. |
ASSESSMENT CRITERION 9 |
Instructions are issued in accordance to regulatory requirements. |
ASSESSMENT CRITERION 10 |
Water management requirements and constraints are adhered to at all times. |
SPECIFIC OUTCOME 2 |
Monitor system conditions. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Schedule program is captured in an Electronic Information System according to requirements. |
ASSESSMENT CRITERION 2 |
Relevant information is continuously monitored to ensure generation capacity meets the actual demand. |
ASSESSMENT CRITERION 3 |
System alarms are responded to according to operating requirements. |
ASSESSMENT CRITERION 4 |
Relevant information obtained is accurate, updated, logged, and communicated to the relevant key receivers according to standards and operating guidelines. |
ASSESSMENT CRITERION 5 |
Relevant information system is timeously monitored, logged updated and communicated according to standards and operating guidelines. |
ASSESSMENT CRITERION 6 |
Relevant information obtained is interpreted and verified against forecast and actual demand/trends. |
SPECIFIC OUTCOME 3 |
Control abnormal system conditions. |
OUTCOME RANGE |
Over and under generation, unit losses, unit trips, inaccurate forecasts, emergency level 1 and 2, constraints, dam levels, Acacia/Koeberg procedures, and loss of Automatic Generator Control |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Abnormal conditions are identified according to requirements. |
ASSESSMENT CRITERION 2 |
Abnormal conditions or deviations are analysed by comparing actual conditions with required conditions. |
ASSESSMENT CRITERION 3 |
Possible solutions are determined to ensure minimum risk to system. |
ASSESSMENT CRITERION 4 |
Corrective action is implemented as per system operating guidelines, procedures and agreements. |
ASSESSMENT CRITERION 5 |
Actions implemented are reviewed as per operating guidelines, policies. |
ASSESSMENT CRITERION 6 |
Relevant information obtained is accurate, updated, logged and communicated to the relevant key receivers according to standards and operating guidelines. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identifying and solving problems in which responses display that responsible decisions using critical and creative thinking have been made. |
UNIT STANDARD CCFO WORKING |
Working effectively with others as a member of a team, group, organization, and community. |
UNIT STANDARD CCFO ORGANISING |
Organising and managing oneself and one's activities responsibly and effectively. |
UNIT STANDARD CCFO COLLECTING |
Collecting, analysing, organizing and critically evaluating information. |
UNIT STANDARD CCFO COMMUNICATING |
Communicating effectively using visual, mathematical and/or language skills in the modes of oral and/or written persuasion. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrating an understanding of the world as a set of related systems by recognizing that problem-solving contexts do not exist in isolation. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Note to assessors:
|
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 57693 | National Diploma: Electrical Network Power Dispatch Controlling | Level 5 | NQF Level 05 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | EWSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |