All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Manage road construction activities |
SAQA US ID | UNIT STANDARD TITLE | |||
15163 | Manage road construction activities | |||
ORIGINATOR | ||||
SGB Civil Engineering Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Physical Planning, Design and Management | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 5 | Level TBA: Pre-2009 was L5 | 20 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2026-06-30 | 2029-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
Learners who are assessed as competent against this unit standard will be able to manage road construction activities in a safe, cost effective manner while complying to project specifications.
This competence forms part of the Elective learning and represents a specific context of management, i.e. managing road construction activities in a civil engineering construction context. It contributes to the development of a professional community of Civil Engineering Construction Managers. The contribution to The National Skills Development Strategy is the key developmental interface between learners and new competencies to be achieved. Its contribution to socio-economic transformation is that learners would be able to undergo RPL-assessment and thereby receive recognition for previous learning and experience. The employability and career prospects of learners can therefore be enhanced by this qualification. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
FETC |
UNIT STANDARD RANGE |
Road types are:
|
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Implement Occupational Health and Safety measures. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The implications of Health and Safety Legislation and regulations pertaining to road construction are explained. |
ASSESSMENT CRITERION 2 |
2. Roadside safety is implemented. |
ASSESSMENT CRITERION 3 |
3. The handling, transport, storage and utilization of hazardous material used in road construction is explained. |
ASSESSMENT CRITERION 4 |
4. Protective clothing and equipment is identified and their use demonstrated. |
ASSESSMENT CRITERION 5 |
5. Training programs to sensitise and train unskilled workers are implemented. |
SPECIFIC OUTCOME 2 |
Plan the execution of road construction activities. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Resources are determined from quantities computed from drawings and project specifications. |
ASSESSMENT CRITERION 2 |
2. A critical path analysis is determined for the execution of the road construction activities. |
ASSESSMENT CRITERION 3 |
3. A construction plan is prepared which included protection of the environment. |
ASSESSMENT CRITERION 4 |
4. Resources are procured, transported and stored as determined from the construction plan. |
SPECIFIC OUTCOME 3 |
Set out the works. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Drawings and specifications are interpreted and setting out information obtained. |
ASSESSMENT CRITERION 2 |
2. Survey controls are put in place. |
ASSESSMENT CRITERION 3 |
3. The work is set out in accordance to project specifications. |
SPECIFIC OUTCOME 4 |
Execute the road construction work. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The work is executed in terms of project specifications. |
ASSESSMENT CRITERION 2 |
2. Production targets are set and monitored to comply with industry norms. |
ASSESSMENT CRITERION 3 |
3. Quality control measures are set in place. |
SPECIFIC OUTCOME 5 |
Prepare as build drawings and materials report. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. As build drawings are prepared from surveyed information. |
ASSESSMENT CRITERION 2 |
2. Materials report is prepared from construction and laboratory control testing reports. |
SPECIFIC OUTCOME 6 |
Rehabilitate the environment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Borrow pit areas are rehabilitated to comply with relevant legislation. |
ASSESSMENT CRITERION 2 |
2. The construction site is cleaned and all spoil transported to approved dumpsites. |
ASSESSMENT CRITERION 3 |
3. Transport routes and camp sites where the environment was damaged, are rehabilitated. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems.
Specific Outcome: Plan the execution of road construction activities. Assessment Criteria |
UNIT STANDARD CCFO WORKING |
Work effectively with others.
Specific Outcome: Implement Occupational Health and Safety measures. Assessment Criteria: Training programs to sensitise and train unskilled workers are implemented. |
UNIT STANDARD CCFO ORGANISING |
Employ self management
Specific Outcome: Execute the road construction work. Assessment Criteria: |
UNIT STANDARD CCFO COLLECTING |
Manage information
Specific Outcome: Plan the execution of road construction activities. Assessment Criteria: Resources are determined from quantities computed from drawings and project specifications. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively
Specific Outcome: Execute the road construction work. Assessment Criteria: |
UNIT STANDARD CCFO SCIENCE |
Demonstrate scientific and technological competence.
Specific Outcome: Plan the execution of road construction activities. Assessment Criteria: |
UNIT STANDARD CCFO DEMONSTRATING |
Understand Contextual world-systems
Specific Outcome: Rehabilitate the environment. Assessment Criteria: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 23683 | National Diploma: Management of Civil Engineering Construction Processes | Level 5 | NQF Level 05 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | CETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |