SAQA All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.
SOUTH AFRICAN QUALIFICATIONS AUTHORITY 
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: 

Utilise semaphore signals/indicators for rail movement on double lines 
SAQA US ID UNIT STANDARD TITLE
14594  Utilise semaphore signals/indicators for rail movement on double lines 
ORIGINATOR
SGB Transport and Logistics Operations 
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY
-  
FIELD SUBFIELD
Field 11 - Services Transport, Operations and Logistics 
ABET BAND UNIT STANDARD TYPE PRE-2009 NQF LEVEL NQF LEVEL CREDITS
Undefined  Regular  Level 3  NQF Level 03 
REGISTRATION STATUS REGISTRATION START DATE REGISTRATION END DATE SAQA DECISION NUMBER
Passed the End Date -
Status was "Reregistered" 
2006-09-05  2009-06-17  SAQA 0160/05 
LAST DATE FOR ENROLMENT LAST DATE FOR ACHIEVEMENT
2010-06-17   2013-06-17  

In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise.  

This unit standard is replaced by: 
US ID Unit Standard Title Pre-2009 NQF Level NQF Level Credits Replacement Status
264378  Utilise semaphore signals for rail movement on double lines  Level 3  NQF Level 03   

PURPOSE OF THE UNIT STANDARD 
A learner will be able to identify, observe and react to semaphore signals/indicators in the specific railway environment on double lines. 

LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING 
Utilise semaphore signals/indicators for rail movement on single lines NQF level. 

UNIT STANDARD RANGE 
The level assigned to this standard is appropriate because performance must be carried out:
  • under different weather conditions
  • during day and night time,
  • in different yards, stations and double line sections,
  • within a specific time span
  • under normal and abnormal circumstances
    This standard is exclusive of:
  • warning boards. 

  • Specific Outcomes and Assessment Criteria: 

    SPECIFIC OUTCOME 1 
    Identitify the particular semaphore signals/indicators on double lines. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. The semaphore signals/indicators on double lines are identified. 

    ASSESSMENT CRITERION 2 
    2. The locations (where erected) of semaphore signals/indicators on double lines. 

    SPECIFIC OUTCOME 2 
    Observe the position of semaphore signals/indicators on double lines. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. The position of semaphore signals/indicators on double lines is observed. 
    ASSESSMENT CRITERION NOTES 
  • Danger position.
  • All right position.
  • Caution position. 
  • ASSESSMENT CRITERION RANGE 
  • Danger position
  • All right position
  • Caution position.
     

  • SPECIFIC OUTCOME 3 
    Adhere to the position of the semaphore signals/indicators on double lines. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. The position of the semaphore signals/indicators on double lines is adhered to. E.g. stop, proceed, etc. 

    SPECIFIC OUTCOME 4 
    Comply with POSMOR and related train working rules to perform safe movement. 
    OUTCOME NOTES 
    Comply with POSMOR and related train working rules to perform safe movement on rail within double lines. (Principles of save movement on rail). 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. POSMOR are complied with to perform safe movement on rail within semaphore signals/indicators on double lines. 

    ASSESSMENT CRITERION 2 
    2. Related train working rules are complied with to perform safe movement on rail within semaphore signals/indicators on double lines. 


    UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS 
    1. An individual wishing to be assessed against this standard may apply to an assessment agency, assessor or provided institution that has been accredited by the relevant ETQA.

    2. A learner specialising in Rail Operations through this elective standard will be assessed by an assessor who has been certified as competent against the National Diploma in Rail Operations, which must include this standard.

    3. A learner specialising in Train Driving through this elective standard will be assessed by an assessor who has been certified as competent against the National Certificate in Train Driving NQF level 4, which must include this standard.

    4. Any assessor and training provider must ensure that the relevant company specific procedures/rules are used as reference material when designing courseware, assessment or when selecting pre-designed assessments.

    5. Anyone assessing a learner against this standard must be registered as an assessor with the relevant TRANSPORT SETA - ETQA.

    6. Any institution offering learning that will enable achievement of this standard must be registered and accredited as a provider at SAQA.

    7. Moderation of assessment will be done by the relevant ETQA as prescribed. 

    UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE 
    1. Principles and theory of semaphore signalling/indicators/boards for the purpose of safe movement on rail.
    2. POSMOR and related specific company train working rules relevant to semaphore
    signalling/indicators/boards.
    3. Relevant elements of OHS Act, Act 85 of 1993.
    4. Protocol of two-way communications to facilitate safe movement on rail.
    5. Layout of yards/stations/sections on double lines. 


    Critical Cross-field Outcomes (CCFO): 

    UNIT STANDARD CCFO IDENTIFYING 
    Problem-solving
    Learners have acquired the generic ability to solve problems by critically evaluating signals/indicators and situations on double lines in order to execute safe movement of rail vehicles. 

    UNIT STANDARD CCFO WORKING 
    Team work
    Learners have acquired the generic ability to work together in a team for the safe movement of rail vehicles under normal and abnormal circumstances (by observing the operated signals and their movement) [position and reaction of the double line signal(s)]. 

    UNIT STANDARD CCFO SCIENCE 
    Use of science and technology
    Learners have acquired the generic ability to use science and technology to effectively control movement by utilising and observing signals/indicators (applying approved signalling and communication systems - signals/hand signals/walkie-talkies). 

    UNIT STANDARD CCFO DEMONSTRATING 
    Inter-relatedness of systems
    Learners have acquired the generic ability to understand that the operational environment includes a set of related systems (by observing the operated signals and their movement) [position and reaction of the double line signal(s). 

    UNIT STANDARD NOTES 
    This unit standard has been unit standard 264378, which is " Utilise semaphore signals for rail movement on double lines", Level 3, 4 credits.

    ASSESSMENT PROCESS

    When conducting assessment, assessors must ensure that they are familiar with the full text of the unit standards being assessed.

    They must ensure that assessment covers the specific outcomes, critical cross-field outcomes and essential embedded knowledge.

    Each environment/situation will be different, it will be necessary to develop assessment activities and tools, which are appropriate to the context in which the assessment will take place.

    METHOD OF ASSESSMENT

    During formal training at the provider:
    1. Written tests
    2. Case studies.
    3. Simulation

    During on the job training:
    1. Oral test
    2. Observations
    3. Case studies.

    Integrated final on the job assessment:
    1. Observation
    2. Oral tests
    3. Case studies

    In the Rail Operations environment it will be more effective to assess a number of unit standards together and the assessor must evaluate each assessment request to determine the grouping of the standards for assessment.

    The assessment must integrate a number of different methods. (Example: When equipment, communication and train movements are normal the integrated assessment will be based on normal working. The abnormal working assessment will then be based on a case study (simulation) or when the abnormal working is in operation during the assessment period, the normal working assessment will be a case study (simulation). This will give the assessor reliable and valid proof of competence and evidence of required attitudes and skills.

    The integrated assessment must take place in the environment where the learner will work independently on completion of final assessment.

    Valid, reliable and authentic evidence (presented as a portfolio of evidence) from past achievements and experience may serve to supplement the assessment of applied competence. The portfolio should include, inter alia:
    1. Written statements from persons (e.g. current and/or previous employer, colleague, peer, manager, external customers) confirming competence of the learner.
    2. Relevant certificates or awards.
    3. Previous assessment records.
    4. Journal (Logbook).

    SUPPLEMENTARY INFORMATION

    Definition: Semaphore signals are fixed signals. Semaphore signals have arms for day signalling and distinctive coloured lights for night and can control shunting and train movements.

    Definition: Indicators comprise of two-way, one-way points indicators and ground indicators.

    Definition: Board comprises of whistle boards, water boards and any other boards announced from time to time in the train working rules.

    POSMOR: Principles of Safe Movement on Rail (POSMOR) includes the following:
  • a defined track for movement,
  • defined track must be clear,
  • stopping at limit of authority,
  • authority for movement received by licensed persons,
  • adhering to speed instructions and track side indicators,
  • being protected, secured and standing clear while stationary,
  • preventing conflicting movement,
  • personal must be fit for duty and
  • being alert, vigilant and assessing surroundings.

    Abnormal Circumstances: Abnormal circumstances embrace all defective/missing/ incorrect positioning and malfunctioning of semaphore signalling on double lines. 

  • QUALIFICATIONS UTILISING THIS UNIT STANDARD: 
      ID QUALIFICATION TITLE PRE-2009 NQF LEVEL NQF LEVEL STATUS END DATE PRIMARY OR DELEGATED QA FUNCTIONARY
    Core  23893   National Certificate: Rail Operations (Functional Yard Operations)  Level 3  NQF Level 03  Passed the End Date -
    Status was "Reregistered" 
    2009-06-17  Was TETA until Last Date for Achievement 
    Elective  49795   National Certificate: Rail Construction and Maintenance  Level 3  NQF Level 03  Passed the End Date -
    Status was "Reregistered" 
    2023-06-30  TETA 


    PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: 
    This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here.
     
    1. School of Rail Wentworth 



    All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.