All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain and repair single phase AC machines and control gear |
SAQA US ID | UNIT STANDARD TITLE | |||
14134 | Maintain and repair single phase AC machines and control gear | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 6 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2007-04-03 | 2009-02-18 | SAQA 0160/05 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2010-02-18 | 2013-02-18 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard is replaced by: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
259038 | Maintain and repair direct-on-line AC rotating machines and control gear | Level 3 | NQF Level 03 | 8 |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the electrical engineering and maintenance environment.
A person credited with this unit standard will be able to: Isolate, maintain, repair and do fault finding on a range of single-phase AC machines and control gear. This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and / or equivalent:
|
UNIT STANDARD RANGE |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan to maintain single phase AC machines and control gear |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Planning done according to prescribed maintenance schedules. |
ASSESSMENT CRITERION 2 |
2. Planning is integrated with other disciplines and associated equipment. |
ASSESSMENT CRITERION 3 |
3. Planning arranged according to equipment operating history reports and failure rate. |
ASSESSMENT CRITERION 4 |
4. Planning aligned with maintenance schedules. |
ASSESSMENT CRITERION 5 |
5. Planning arranged according to plant availability and customer requirements. |
SPECIFIC OUTCOME 2 |
Prepare to maintain single phase AC machines and control gear |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Isolation points of AC machines and control gear identified against job instructions and work site procedures. |
ASSESSMENT CRITERION 2 |
2. Isolation undertaken safely and according to worksite procedures. |
ASSESSMENT CRITERION 3 |
3. Safe isolation of AC machines and control gear verified against job instructions and worksite procedures. |
ASSESSMENT CRITERION 4 |
4. Safety and/or security lockout systems applied according to worksite procedures and safety practices. |
ASSESSMENT CRITERION 5 |
5. Reasons for having isolation points in certain areas explained in accordance with plant layout and safety procedures and standards |
ASSESSMENT CRITERION 6 |
6. The importance of verification when isolating AC machines and controls explained in accordance with plant layout and safety procedures and standards |
ASSESSMENT CRITERION 7 |
7. Location and purpose of installing warning signs to be explained in terms of work site procedures |
SPECIFIC OUTCOME 3 |
Conduct fault finding on single phase AC machines and control gear |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Proper and safe fault finding procedures are followed. |
ASSESSMENT CRITERION 2 |
2. Correct fault finding procedures with the aid of testing and measuring equipment are followed in terms of work site procedures |
ASSESSMENT CRITERION 3 |
3. Applicable tools and equipment are correctly used in terms of work site procedures |
ASSESSMENT CRITERION 4 |
4. Reasons for applying specific procedures explained in terms of fault finding procedures |
ASSESSMENT CRITERION 5 |
5. Logical sequence of faultfinding procedures explained in terms of work site procedures |
SPECIFIC OUTCOME 4 |
Maintain single phase AC machines and control gear |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Correct repairing procedures with the aid of testing and measuring equipment are followed. |
ASSESSMENT CRITERION 2 |
2. Corrective action to be taken in repairing process fully explained. |
ASSESSMENT CRITERION 3 |
3. Proper and safe maintenance procedures are followed according to work site procedures. |
ASSESSMENT CRITERION 4 |
4. Maintenance is carried out according to manufacture's specifications |
ASSESSMENT CRITERION 5 |
5. Applicable tools and equipment are correctly used during maintenance. |
ASSESSMENT CRITERION 6 |
6. The corrective action is taken in maintenance process |
ASSESSMENT CRITERION 7 |
7. Reasons for applying specific maintenance procedure and selecting of a specific tools and equipment are fully explained in terms of work site procedures |
ASSESSMENT CRITERION 8 |
8. The reasons for doing maintenance are explained in terms of work site procedures |
ASSESSMENT CRITERION 9 |
9. Reasons for corrective action to be taken in the maintenance process are explained in terms of work site procedures |
SPECIFIC OUTCOME 5 |
Complete the work task |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Work area cleaned on completion of task according to housekeeping requirements. |
ASSESSMENT CRITERION 2 |
2. Waste materials disposed of according to site-specific standards and procedures. |
ASSESSMENT CRITERION 3 |
3. AC machines and control gear re-commissioned on completion of task. |
ASSESSMENT CRITERION 4 |
4. Quality checks conducted and corrective action taken where required. |
ASSESSMENT CRITERION 5 |
5. Lockout devices and warning signs removed. |
ASSESSMENT CRITERION 6 |
6. Documentation is completed and recorded |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA.
2. Any institution offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA by SAQA. 3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines in the relevant qualification and the agreed ETQA procedures |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Knowledge that will help me understand and that I will be able to explain: .? Identification and functions of relevant components .? Proper usage of relevant testing and measuring equipment. |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems in isolating, maintaining, repairing and doing faultfinding. |
UNIT STANDARD CCFO WORKING |
Work effectively with others during the isolating, maintaining, repairing and fault finding process. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself in planning the work and determining a sequence of operation. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information obtained during isolating, maintaining, repairing and fault finding processes. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate with superior in reporting completion of job |
UNIT STANDARD NOTES |
This unit standard has been replaced by unit standard 259038, which is "Maintain and repair direct-on-line AC rotating machines and control gear", Level 3, 8 credits.
This Unit Standard was originally registered on 12 June 2002 under SAQA decision number 0742/02. It has been re-registered on 11 February 2004 under SAQA 2552/04. Specified requirements include legal and legislative specific requirements and are contained in one or more of the following documents: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 20419 | National Certificate: Electrical Engineering | Level 3 | NQF Level 03 | Passed the End Date - Status was "Registered" |
2004-02-10 | Was EWSETA until Last Date for Achievement |
Core | 48475 | National Certificate: Electrical Engineering | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2009-02-18 | Was EWSETA until Last Date for Achievement |
Elective | 49056 | National Certificate: Domestic Appliance Repair | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | EWSETA |
Elective | 58288 | National Certificate: Electro-Mechanics | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |