All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain production efficiencies in industrial rubber manufacturing processes |
SAQA US ID | UNIT STANDARD TITLE | |||
13201 | Maintain production efficiencies in industrial rubber manufacturing processes | |||
ORIGINATOR | ||||
SGB Manufacturing and Assembly Processes | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 5 | Level TBA: Pre-2009 was L5 | 12 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
Learners who are involved in maintaining production efficiencies in industrial rubber manufacturing processes require the skills, values and knowledge reflected in this unit standard.
Qualifying learners can schedule and monitor the realisation of industrial rubber production. They will understand how to plan and prioritise the production process and how this is achieved. This will include identifying problems and taking corrective action. The learning outcomes in this unit standard also contribute to the exit level outcomes required for the National Certificate in Industrial Rubber Manufacturing (Mixing, Extruding, Moulding or Calendaring) (NQF level 5) and related qualifications. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
This unit standard has been designed as part of a progression. It is one of a series of unit standards for producing product in an industrial rubber manufacturing skills area.
The credits allocated to this unit standard assume that a learner has already learned to: |
UNIT STANDARD RANGE |
The ranges indicated under the specific outcomes determine the scope and level of this unit standard.
The learner should be able to work autonomously with no supervision and according to worksite and manufacturer specifications and occupational safety, health and environmental legislation. Work is generally, but not exclusively, carried out in a team environment. This unit standard focuses on the technical aspects of the production process. It is not meant to be a replacement for management or supervisory standards. Issues of work organisation, discipline, grievances, relationships between management and workers are not assessed as part of this standard. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Work safely with due care for self, fellow workers, equipment, materials and the environment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
SPECIFIC OUTCOME 2 |
Discuss and explain incidents and problems relating to maintaining production efficiencies. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
SPECIFIC OUTCOME 3 |
Identify and solve problems. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
SPECIFIC OUTCOME 4 |
Keep records of changes, compile and process reports. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
SPECIFIC OUTCOME 5 |
Monitor quantity and quality realisation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
SPECIFIC OUTCOME 6 |
Issue production schedule. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
SPECIFIC OUTCOME 7 |
Plan, prioritise and schedule production. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
SPECIFIC OUTCOME 8 |
Ensure correct and available resources and safe production environment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
SPECIFIC OUTCOME 9 |
Plan and prepare for activity. |
OUTCOME RANGE |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
SPECIFIC OUTCOME 10 |
Share and discuss information and resolve issues which impact on quality, output and efficiencies. |
OUTCOME RANGE |
Information includes production schedules, customer requirements, production reports, graphs and trends |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Production schedule is developed. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 2 |
2. Quality product is produced in required quantities. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 3 |
3. Production targets are met. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 4 |
4. Incidents and accidents are minimised. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 5 |
5. Optimal utilisation of resources is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 6 |
6. Problems are attended to. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
ASSESSMENT CRITERION 7 |
7. Accurate reports on activities are available. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Affected parties are informed in a timely manner of production requirements 2. Applicable health, safety and environmental procedures are adhered to 3. Change over time meets industry standard 4. Scrap levels and down time is minimised 5. Report compilation and processing is done in a timely manner 6. Appropriate corrective action is taken for presented situations 7. Solutions to problems work and their effectiveness is reviewed and recorded 8. Solutions to problems are cost effective and safe 9. Production targets are met Understanding confirmed: Responding to 'what if' and 'why' questions related to: |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
My assessment will be governed by the policies and guidelines of the MERSETA Education and Training Quality Assuror who has jurisdiction over this field of learning. My assessor will (at the very least) be accredited and have a technical qualification in this learning area.
I can be assessed in the language of my choice although if I have to report incidents or conditions to someone else, I will be assessed on my ability to report in the language commonly used in my working environment. I will be assessed in the workplace but I can submit documents, projects, test results and assignments that were not produced in the workplace. I can be assessed against this unit standard to obtain credits or as part of an integrated assessment for a qualification. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Names & functions of:
Purpose of: Attributes, descriptions, characteristics & properties: Sensory cues: Processes and events, causes and effects, implications: Procedures and techniques: Regulations, legislation, agreements, policies, standards: Theory: rules, principles, laws: Relationships, systems: |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems:
|
UNIT STANDARD CCFO WORKING |
Work effectively with others:
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage myself and my activities:
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information:
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively:
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically:
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems:
|
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 23260 | National Certificate: Industrial Rubber Manufacturing: Mixing OR Extruding OR Moulding OR Calendaring | Level 5 | Level TBA: Pre-2009 was L5 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |