SAQA All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.
SOUTH AFRICAN QUALIFICATIONS AUTHORITY 
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: 

Conduct mould or material trials in industrial rubber manufacturing processes 
SAQA US ID UNIT STANDARD TITLE
13200  Conduct mould or material trials in industrial rubber manufacturing processes 
ORIGINATOR
SGB Manufacturing and Assembly Processes 
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY
-  
FIELD SUBFIELD
Field 06 - Manufacturing, Engineering and Technology Manufacturing and Assembly 
ABET BAND UNIT STANDARD TYPE PRE-2009 NQF LEVEL NQF LEVEL CREDITS
Undefined  Regular  Level 5  Level TBA: Pre-2009 was L5  12 
REGISTRATION STATUS REGISTRATION START DATE REGISTRATION END DATE SAQA DECISION NUMBER
Passed the End Date -
Status was "Reregistered" 
2018-07-01  2023-06-30  SAQA 06120/18 
LAST DATE FOR ENROLMENT LAST DATE FOR ACHIEVEMENT
2024-06-30   2027-06-30  

In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise.  

This unit standard does not replace any other unit standard and is not replaced by any other unit standard. 

PURPOSE OF THE UNIT STANDARD 
Learners who are involved in conducting mould or material trials in industrial rubber manufacturing processes require the skills, values and knowledge reflected in this unit standard.
Qualifying learners can determine the performance of new moulds and materials. They will understand how to formulate project plans, run trials and how this is achieved. This will include identifying and resolving problems experienced.

The learning outcomes in this unit standard also contribute to the exit level outcomes required for the National Certificate in Industrial Rubber Manufacturing (Mixing, Extruding, Moulding or Calendaring) (NQF level 5) and related qualifications. 

LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING 
This unit standard has been designed as the start of a progression. It is one of a series of unit standards for producing product in a rubber manufacturing skills area.
The credits allocated to this unit standard assume that a learner has already learned to:
  • Test rubber product
  • Perform statistical process control 

  • UNIT STANDARD RANGE 
    The ranges as indicated under the specific outcomes determine the scope and level of this unit standard.
    The learner should be able to work autonomously with no supervision and according to worksite and manufacturer specifications and occupational safety, health and environmental legislation.
    Work is generally, but not exclusively, carried out in a team environment. This standard may require me to involve others in the process. They may carry out parts of the trial under my direction. I will be assessed on my ability to brief and advise them.
    This standard covers the introduction of any new aspect in the rubber manufacturing process. It includes aspects such as:
  • New moulds, materials or equipment
  • Redesigned tooling, materials, mixtures, compounds or equipment 

  • Specific Outcomes and Assessment Criteria: 

    SPECIFIC OUTCOME 1 
    Plan and prepare for activity. 
    OUTCOME RANGE 
    Planning and preparation includes collecting schedules, determining job requirements and planning the process. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 2 
    Collect data for evaluation. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 3 
    Formulate project plan. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 4 
    Select and brief project team. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 5 
    Arrange necessary tools, equipment and material. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 6 
    Run trials and compile and process report on results. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 7 
    Identify problems and take corrective action. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 8 
    Present final report and recommendations. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 9 
    Discuss and explain incidents and problems relating to trials. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • SPECIFIC OUTCOME 10 
    Work safely with due care for self, fellow workers, equipment, materials and the environment. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Data on performance of mould or material is collected. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 2 
    2. Sample product is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 3 
    3. Project plan is produced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 4 
    4. Data on product is sourced. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 5 
    5. Inspection and test results are collated and recorded. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 6 
    6. Project team is competent. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 7 
    7. Product cost is within budget. 
    ASSESSMENT CRITERION NOTES 
    Indicators:

    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed:

    Responding to 'what if' and 'why' questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 

  • ASSESSMENT CRITERION 8 
    Results achieved
    1. Data on performance of mould or material is collected
    2. Sample product is produced
    3. Project plan is produced
    4. Data on product is sourced
    5. Inspection and test results are collated and recorded
    6. Project team is competent
    7. Product cost is within budget

    Indicators
    1. Effective plan to test and determine best options is developed
    2. Procedures are adhered to
    3. Final report and recommendations are delivered within allocated timeframes
    4. Accuracy in recording of detail
    5. Problems are responded to in a timely manner
    6. The various activities and people involved are co-ordinated effectively
    7. Work is carried out in a safe manner

    Understanding confirmed
    1. Responding to `what if` and `why` questions related to:
  • Range of options
  • Salient features of trial
  • Areas of concern
  • Recommendations on the design or manufacture of the mould or the modification of the materials tested 


  • UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS 
    My assessment will be governed by the policies and guidelines of the MERSETA Education and Training Quality Assuror who has jurisdiction over this field of learning. My assessor will (at the very least) be accredited and have a technical qualification in this learning area.
    I can be assessed in the language of my choice although if I have to report incidents or conditions to someone else, I will be assessed on my ability to report in the language commonly used in my working environment.
    I will be assessed in the workplace but I can submit documents, projects, test results and assignments that were not produced in the workplace.
    I can be assessed against this unit standard to obtain credits or as part of an integrated assessment for a qualification. 

    UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE 
    1. Names & functions of:
  • Equipment, materials, additives and tooling related to the trial

    2. Purpose of:
  • Nothing given - was this a mistake made during re-formatting, or is there nothing under this heading?

    3. Attributes, descriptions, characteristics & properties:
  • Properties of materials

    4. Sensory cues:
  • Related to the process and process variations (appearance, sound, smell, feel)

    5. Processes and events, causes and effects, implications:
  • Obtaining and working with base-line information
  • Working methodically and reducing the impact of multiple variables
  • Recording all information

    6. Procedures and techniques:
  • Running trials with a methodical change of variables
  • Determining mathematically or empirically starting points, setting positions and parameters

    7. Regulations, legislation, agreements, policies, standards:
  • Applicable safety, health and environmental protection legislation
  • Applicable company policies and procedures
  • Quality standards and specifications

    8. Theory: rules, principles, laws:
  • Summarising data (sum, average, difference, deviations, trends)
  • Scientific principles and techniques
  • Relevant mathematics and statistics
  • Relevant engineering and polymeric principles
  • Impact of changing variables on underlying physical and chemical properties

    9. Relationships, systems:
  • Knowledge of process capability and impact of changes 

  • UNIT STANDARD DEVELOPMENTAL OUTCOME 
    N/A 

    UNIT STANDARD LINKAGES 
    N/A 


    Critical Cross-field Outcomes (CCFO): 

    UNIT STANDARD CCFO IDENTIFYING 
    Identify and solve problems:
  • Anticipate possible problems and plan procedures to limit those problems 

  • UNIT STANDARD CCFO WORKING 
    Work effectively with others:
  • Co-ordinate efforts of the project team 

  • UNIT STANDARD CCFO ORGANISING 
    Organise and manage myself and my activities:
  • Plan a project to test and evaluate unknown situation
  • Manage resources and my time 

  • UNIT STANDARD CCFO COLLECTING 
    Collect, analyse, organise and critically evaluate information:
  • Collect data and determine set of parameters for optimum performance
  • Collect data and determine gaps and problem areas
  • Make recommendations based on that information 

  • UNIT STANDARD CCFO COMMUNICATING 
    Communicate effectively:
  • Brief project team members on their roles in the project plan 

  • UNIT STANDARD CCFO SCIENCE 
    Use science and technology effectively and critically:
  • Conduct trials using scientific method
  • Determine effects of new mould or material technology 

  • UNIT STANDARD CCFO DEMONSTRATING 
    Demonstrate an understanding of the world as a set of related systems:
  • Determine optimum criteria to satisfy requirements for:
  • Quality
  • Efficiency
  • Cost effectiveness
  • Safety and health
  • Understand and discuss my role in mould and material trials in respect to the broader manufacturing process 

  • UNIT STANDARD ASSESSOR CRITERIA 
    N/A 

    REREGISTRATION HISTORY 
    As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. 

    UNIT STANDARD NOTES 
    N/A 

    QUALIFICATIONS UTILISING THIS UNIT STANDARD: 
      ID QUALIFICATION TITLE PRE-2009 NQF LEVEL NQF LEVEL STATUS END DATE PRIMARY OR DELEGATED QA FUNCTIONARY
    Core  23260   National Certificate: Industrial Rubber Manufacturing: Mixing OR Extruding OR Moulding OR Calendaring  Level 5  Level TBA: Pre-2009 was L5  Passed the End Date -
    Status was "Reregistered" 
    2023-06-30  MERSETA 


    PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: 
    This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here.
     
    NONE 



    All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.