All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Install precast concrete pipes |
SAQA US ID | UNIT STANDARD TITLE | |||
12903 | Install precast concrete pipes | |||
ORIGINATOR | ||||
SGB Building Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Building Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 5 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2026-06-30 | 2029-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who work in the construction industry. People credited with this unit standard are able to prepare and place precast concrete culverts. Previously disadvantaged persons who through recognition of prior learning will be able to be accessed against this standard and receive National recognition for their competence. This will enhance their employability and career advancement and contribute to the socio-economic transformation of the country. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
ABET 4 in Literacy and numeracy. |
UNIT STANDARD RANGE |
1. Materials include precast concrete pipes, and box culverts,
2. Precast concrete pipes include spigot and socket, in-the wall, and ogee type joints, with and without rubber rings, 3. Pipes are to include for water, sewer and sleeves for other services, 4. Methods of laying include manual and plant assisted 5. Corrective action includes: eliminating and/or reporting 6. Offloading should include both manual methods and with the use of plant. 7. Testing should include visual alignment, and water and air pressure tests. 8. Finishing should include the removal of all excess materials. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Demonstrate knowledge of technology to install pre-cast concrete pipes. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The technologies of installing pre-cast concrete pipes are explained. |
ASSESSMENT CRITERION 2 |
2. The cost and socio-economic benefits of more labour intensive pipe installation technologies are explained and compared to plant intensive procedures. |
SPECIFIC OUTCOME 2 |
Prepare the work area before installing culvert. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1 Work area is checked for hazards. All hazards are identified and corrective action is taken in line with worksite housekeeping procedures. |
ASSESSMENT CRITERION RANGE |
Corrective action includes: eliminating and/or reporting. |
ASSESSMENT CRITERION 2 |
2 All tools, equipment and personal protective equipment required for the task are identified and ensured to be functional, and are ready for use at work area. |
ASSESSMENT CRITERION 3 |
3 All legislated safety precautions are adhered to in terms of work carried out below ground level. |
ASSESSMENT CRITERION 4 |
4 The excavated trench, bedding, and work area is neat, free of obstructions, water, and loose material within specification tolerances, and adheres to all design specifications in accordance with given instructions and drawings. |
ASSESSMENT CRITERION 5 |
5 The area is set out to line and level to receive the pipes in accordance with contract requirements. |
ASSESSMENT CRITERION 6 |
6 Precast concrete units are offloaded and stacked or placed along the trench (stringing) according to site standard operating procedures. |
ASSESSMENT CRITERION RANGE |
Offloading should include both manual methods and with the use of plant. |
SPECIFIC OUTCOME 3 |
Install precast concrete units. |
OUTCOME RANGE |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1 Work is carried out in accordance with work place safety requirements. |
ASSESSMENT CRITERION 2 |
2. Tools and equipment are used in accordance with their designed purpose. |
ASSESSMENT CRITERION 3 |
3. Personal protective equipment is used as required in accordance with the OHS Act. |
ASSESSMENT CRITERION 4 |
4. Concrete units and fittings are laid neat and true to line and level within specification tolerances, and adhere to all design specifications in accordance with given instructions. |
ASSESSMENT CRITERION 5 |
5. The precast units are installed within industry acceptable time frames. |
ASSESSMENT CRITERION 6 |
6. Assistants are used effectively and instructions are given clearly and in such a way that promotes good working relationships. |
SPECIFIC OUTCOME 4 |
Finishing the installation of concrete culverts. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The pipeline is cleaned and disinfected according to contract requirements. |
ASSESSMENT CRITERION 2 |
2. Work is measured for payment according to industry-prescribed methods, and pay items in the contract schedule of quantities. |
ASSESSMENT CRITERION 3 |
3. The pipeline is tested in accordance with the specifications. |
ASSESSMENT CRITERION RANGE |
Testing should include visual alignment, and water and air pressure tests. |
ASSESSMENT CRITERION 4 |
4. The pipe laying operation is finished-off to contract requirements |
ASSESSMENT CRITERION RANGE |
Finishing should include the removal of all excess materials. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
Assessment of learner achievements takes place at providers accredited by CETA (RSA, 1998b) for the provision of programs that result in the outcomes specified for the Certificate for Construction (level 2). CETA is responsible for moderation of learner achievements of learners who meet the requirements of this qualification.
A memorandum of understanding with other ETQA bodies need to be signed when training providers working in other Sectors, requires assessment of learner achievements to take place against this unit standard. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Qualifying learners understand and can explain:
1. The preparation of the work area before pipe installation. 2. The pipe installation process. 3. Finishing the installed pipes. 4. Measure for payment / record purposes. |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems. Hazards are determined and corrective action taken.
Tools are selected. Pipes installed within tolerances. All this relates to: Demonstrate knowledge of technology to install pre-cast concrete pipes. Prepare the work area before installing culvert. |
UNIT STANDARD CCFO WORKING |
Work effectively with others. Assistants are used effectively and instruction given clearly and in such a way that promotes good working relationships. This relates to:
Prepare the work area before installing culvert. |
UNIT STANDARD CCFO ORGANISING |
Employ self management. Processes are organized and relates to:
Demonstrate knowledge of technology to install pre-cast concrete pipes. Prepare the work area before installing culvert. Install precast concrete units. Manage information. Work must be to specifications, which relates to: Demonstrate knowledge of technology to install pre-cast concrete pipes. Prepare the work area before installing culvert. Install precast concrete units. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively. Communication with assistants during the execution of the work to be effective. This relates to:
Demonstrate knowledge of technology to install pre-cast concrete pipes. Prepare the work area before installing culvert. Install precast concrete units. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate scientific and technological competence. Hazards are determined and corrective action taken.
Work is set out. This is related to: Demonstrate knowledge of technology to install pre-cast concrete pipes. |
UNIT STANDARD CCFO CONTRIBUTING |
Understand Contextual world-systems. Work must be acceptable to the client.
Measuring for payment purposes is done. This relates to: Install precast concrete units. |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49411 | General Education and Training Certificate: Construction | Level 1 | NQF Level 01 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | CETA |
Elective | 22977 | National Certificate: Construction: Roadworks | Level 1 | NQF Level 01 | Passed the End Date - Status was "Registered" |
2005-12-04 | CETA |
Elective | 61689 | National Certificate: Community Water, Health and Sanitation Promotion | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | EWSETA |
Elective | 49410 | National Certificate: Construction | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | CETA |
Elective | 24173 | National Certificate: Construction: Roadworks | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | CETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | Abasizi Contractor Development Services Pty Ltd |
2. | Academy for Construction Skills (Pty) Ltd (ACS) |
3. | Aveng Grinaker -LTA Civil Engineering |
4. | Big Tree Group |
5. | Bright Storm Projects |
6. | EDUCATORY ELECTRO SERVICES |
7. | ERGO MAPHELONG INSTITUTE (PTY) LTD |
8. | ESKOM GENERATION - PALMIET PUMP STORAGE GRABOUW |
9. | In Touch Community Development & Project Managers |
10. | Leps Training Consultants |
11. | Madzahisi College |
12. | Mahumani Empowerment Servives Centre |
13. | Motheo Academy PTY LTD |
14. | NTANDOKAZI HOLDINGS (PTY) LTD |
15. | Othandweni Training Centre |
16. | PIONEER BUSINESS CONSULTING (PTY) LTD |
17. | POWER SYSTEMS TRAINING, CAPE TOWN |
18. | Pro Skills Development (Pty) Ltd |
19. | Raubex Construction Pty (Ltd) |
20. | Sakhisizwe Development Training |
21. | Sheq and Environmental Projects |
22. | Sonani Training and Communications |
23. | South African Value Education (Pty) Ltd |
24. | Thabomeleng |
25. | Tjeka Training Matters Pty Ltd |
26. | Training Force (Pty) Ltd |
27. | Zama Training & Development cc |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |