All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Install and terminate electrical cables and conductors |
SAQA US ID | UNIT STANDARD TITLE | |||
12412 | Install and terminate electrical cables and conductors | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 6 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2004-12-02 | 2007-12-02 | SAQA 1657/04 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2008-12-02 | 2011-12-02 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Electrical Engineering; Generation; Distribution; Transmission, Construction and Renewable Energy Sector.
The person credited with this unit standard is capable of: Planning, installing and terminating, electrical cables and conductors according to statutory requirements to distribute and control electricity to electrical apparatus. This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan to install electrical cables and conductors. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Cable/ conductor equipment needed for installing and terminating cables is checked for functionality and safety and is available for use on site. |
ASSESSMENT CRITERION RANGE |
Cable Equipment: - Come-along; Pulley; Sock; Draw wire |
ASSESSMENT CRITERION 2 |
2. Personal protective clothing and equipment needed for installation and termination of cables and conductors is available for use. |
ASSESSMENT CRITERION RANGE |
Hard Hat; Safety Harness; Gloves; Safety Glasses; Safety Shoes; Extension Ladders |
ASSESSMENT CRITERION 3 |
3. Job instructions are obtained and correctly interpreted. |
ASSESSMENT CRITERION RANGE |
Layout Sketch or Drawings; Work Sheets or Job Cards |
ASSESSMENT CRITERION 4 |
4. Tools and materials required for installing and terminating of cables are available for use. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 5 |
5. Worksite is inspected for hazards and corrective action is taken according to Occupational Health and Safety Act. |
SPECIFIC OUTCOME 2 |
Prepare to install electrical cables and conductors. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Point of installation is identified in accordance with work instruction and drawings / plans. |
ASSESSMENT CRITERION 2 |
2. Work area is demarcated according to statutory requirements. |
ASSESSMENT CRITERION RANGE |
Danger Tape; Marker Poles; Cones; Hazard Light |
ASSESSMENT CRITERION 3 |
3. Trenches are prepared and inspected according to work requirements; standards and statutory requirements. |
ASSESSMENT CRITERION 4 |
4. Ducting and kick pipes in place in accordance with job requirements. |
ASSESSMENT CRITERION 5 |
5. Pulling devices are positioned in ducting and kick pipes in accordance with job requirements. |
ASSESSMENT CRITERION RANGE |
Draw wires; Draw cables; pulling sock |
ASSESSMENT CRITERION 6 |
6. Obstacles are identified and necessary precautions are taken in accordance with local authority; wayleaves and servitudes and electrical regulations. |
ASSESSMENT CRITERION RANGE |
Water pipes; High Voltage cables; communication cables and conductor |
SPECIFIC OUTCOME 3 |
Install electrical cables and conductors. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Electrical cables/conductors are installed, positioned and secured according to statutory requirements and worksite procedures. |
ASSESSMENT CRITERION RANGE |
South African Bureau of Standards 01042 |
ASSESSMENT CRITERION 2 |
2. Minimum prescribed tail lengths are left for termination. |
ASSESSMENT CRITERION RANGE |
Manufacturer specification and work site requirement |
ASSESSMENT CRITERION 3 |
3. Electrical cables/conductors are marked according to work site procedures; standards requirements. |
ASSESSMENT CRITERION RANGE |
Numbers and labels. |
ASSESSMENT CRITERION 4 |
4. Tools and equipment are used safely to meet the requirements of the job. |
ASSESSMENT CRITERION 5 |
5. Personal protective equipment is used and site specific procedures are adhered to throughout the installing process. |
ASSESSMENT CRITERION 6 |
6. Different ways to secure cables/conductors is explained according to work site conditions and statutory requirements. |
ASSESSMENT CRITERION RANGE |
Cables ties, banded strapping, cable guards and cable clamps. |
SPECIFIC OUTCOME 4 |
Terminate electrical cables/conductors. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Cable Gland is positioned; secured and assembled according to manufacturer's specifications; work place requirements and standards. |
ASSESSMENT CRITERION RANGE |
Armouring; Glanding; Shroud; Gland Plate; compression gland |
ASSESSMENT CRITERION 2 |
2. Cable ends are prepared for termination according to manufacturer's specifications; work place requirements and standards. |
ASSESSMENT CRITERION RANGE |
Strip Cable end; Heatshrink cores; lug conductor; binding armouring |
ASSESSMENT CRITERION 3 |
3. Air Dac cable ends are prepared for termination according to manufacturer's specifications; work place requirements and standards. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 4 |
4. Bundle conductor ends are prepared for termination according to manufacturer's specifications; work place requirements and standards. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 5 |
5. Electrical cable/conductors made-off / Terminated according to Work site procedures and standards or job requirements. |
ASSESSMENT CRITERION RANGE |
Connections to supply and load, in or on equipment |
SPECIFIC OUTCOME 5 |
Complete work task. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Cable demarcation tape/ markers are in place according to work site procedures and standards. |
ASSESSMENT CRITERION RANGE |
Danger Tape; Road crossing markers |
ASSESSMENT CRITERION 2 |
2. Reinstate the terrain in accordance with work site procedures; environmental requirements and customer requirements. |
ASSESSMENT CRITERION RANGE |
Filling of trenches; compacting of soil; replacing of original surface |
ASSESSMENT CRITERION 3 |
3. Ensure that all termination connections are secure and tight according to manufacturers specifications and work site standards. |
ASSESSMENT CRITERION 4 |
4. Sagging of overhead cables and conductors are as per manufacturers specifications; work site standards and clearances. |
ASSESSMENT CRITERION 5 |
5. Work area is cleaned after completion of task in accordance with work site procedures and housekeeping standards. |
ASSESSMENT CRITERION 6 |
6. Waste materials are disposed of in accordance with safety standards and environmental requirements. |
ASSESSMENT CRITERION 7 |
7. Environmental aspects are taken into consideration as per environmental impact studies / management. |
ASSESSMENT CRITERION 8 |
8. Necessary documentation is completed and submitted to designated personnel. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO WORKING |
Tasks using responsible thinking and decision making (in relation to the use and choice of relevant personal protecting equipment). |
UNIT STANDARD CCFO ORGANISING |
Organise oneself and one`s activities responsibly and effectively (in the ability to follow instructions when working by ones self or in a work team, ensure safe execution of work activities). |
UNIT STANDARD CCFO COLLECTING |
Collect, evaluate, organise and critically evaluate information related to (installing and terminating of electrical cables and conductors). |
UNIT STANDARD CCFO COMMUNICATING |
Effective use of communication methods when (recording and reporting information). |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, showing responsibility towards the environmental and the health of others (installing and terminating of electrical cables and conductors ensuring that all safety and environmental conditions are considered). |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
UNIT STANDARD NOTES |
LEGAL REQUIREMENTS:
SABS 0142-1 SABS 1507 Relevant environmental management processes / procedures Relevant sections of the OHS Act A glossary of terms about the terminology of: CONTEXT SPECIFIC Specific to a discipline or a industry |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 20418 | National Certificate: Electrical Engineering | Level 2 | NQF Level 02 | Passed the End Date - Status was "Registered" |
2004-02-10 | Was EWSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |