All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Grind rails of various profiles and grades |
SAQA US ID | UNIT STANDARD TITLE | |||
120445 | Grind rails of various profiles and grades | |||
ORIGINATOR | ||||
SGB Manufacturing and Assembly Processes | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 13 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for a learner within the fabrication and welding fields. Learners credited with this unit standard will be able to grind rails of various profiles and grades by means of the relevant rail grinding equipment safely and to a high degree of accuracy in accordance with required quality specifications and standards.
The qualifying learner is capable of: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in:
The unit standard: |
UNIT STANDARD RANGE |
Performance must be carried out:
This unit standard is inclusive of all types of rail structures. This unit standard is exclusive of non-ferrous metals. This unit standard is inclusive of all IC-electric and hydraulic-driven rail grinding equipment. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and prepare resources and equipment prior to the grinding of rails. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Tools, equipment and consumables are identified, selected and verified for specific welding activities in accordance with company specifications. |
ASSESSMENT CRITERION RANGE |
Equipment can include, but is non-limited to personal protective, fire fighting, and first aid equipment. |
ASSESSMENT CRITERION 2 |
Operation of relevant machines and equipment is checked and tested correctly according to company specific procedures. |
ASSESSMENT CRITERION 3 |
Relevant tools, equipment and consumables are loaded or off-loaded safely and correctly in accordance with company and legislative safety policies, procedures and instructions. |
SPECIFIC OUTCOME 2 |
Plan and prepare for the grinding of rails. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work area is observed and assessed for accessibility and hazardous conditions. |
ASSESSMENT CRITERION 2 |
Hazardous conditions are identified and reacted to in accordance with company specifications. |
ASSESSMENT CRITERION 3 |
Specific rail structure is identified correctly. |
ASSESSMENT CRITERION RANGE |
Crossings and rails. |
ASSESSMENT CRITERION 4 |
On-track protection is obtained and set out correctly in accordance with set requirements. |
ASSESSMENT CRITERION 5 |
Perway preparatory work done is confirmed with relevant role-players. |
ASSESSMENT CRITERION 6 |
Rail-grinding equipment is selected to suit the specific circumstances (and is prepared according to company-specific procedures and manufacturer's specifications). |
ASSESSMENT CRITERION RANGE |
Crossings or track. |
SPECIFIC OUTCOME 3 |
Grind rails of various profiles and grades. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Rail structures are correctly prepared in accordance with prescribed instructions and specifications. |
ASSESSMENT CRITERION 2 |
Grinding area on rail is marked off accurately in accordance with prescribed procedures and specifications. |
ASSESSMENT CRITERION 3 |
Rail-grinding equipment is placed correctly and isolation is ensured according to company specific procedures, instructions and specifications. |
ASSESSMENT CRITERION 4 |
Relevant rail-grinding equipment is used safely and correctly to grind rails of various profiles and grades according to company-specific procedures and manufacturer's specifications. |
ASSESSMENT CRITERION 5 |
Rail is ground accurately and safely in accordance with rail-grinding procedures and specifications. |
ASSESSMENT CRITERION 6 |
All equipment is removed from rail in safely and correctly accordance with company specific procedures and manufacturer's specifications. |
ASSESSMENT CRITERION 7 |
Relevant tools, equipment, consumables and debri are removed from worksite safely and correctly in accordance with legislative and company-specific procedures and instructions. |
SPECIFIC OUTCOME 4 |
Complete the relevant technical documentation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work orders and instructions are interpreted and understood in accordance with company's policies and procedures. |
ASSESSMENT CRITERION 2 |
Information is reported to the relevant parties in line with the set standards. |
ASSESSMENT CRITERION 3 |
The completed documentation is administered in accordance with company's policies and procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Learners can understand and explain:
|
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Problem solving
Learners can identify and solve problems with regard to: |
UNIT STANDARD CCFO WORKING |
Teamwork
Learners can work effectively in teams when: |
UNIT STANDARD CCFO ORGANISING |
Self-organisation and -management
Learners can organise and manage one-self by: |
UNIT STANDARD CCFO COLLECTING |
Information evaluation
Learners can evaluate information: |
UNIT STANDARD CCFO COMMUNICATING |
Communication
Learners can communicate effectively: |
UNIT STANDARD CCFO SCIENCE |
Use of Science and technology
Learners can use science and technology by: |
UNIT STANDARD CCFO DEMONSTRATING |
Interrelatedness of systems
Learners can understand that, by eliminating the dynamic effects on the track, the life span of the component and track structure is enhanced, thus contributing to the safe passage of rail traffic. |
UNIT STANDARD CCFO CONTRIBUTING |
Learner and societal development
Learners can understand the importance of: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Values:
Supplementary information: Rail vehicles include all trains and other on-track inspection and maintenance vehicles capable of travelling on railway track. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49795 | National Certificate: Rail Construction and Maintenance | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |