All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain sleepers |
SAQA US ID | UNIT STANDARD TITLE | |||
120034 | Maintain sleepers | |||
ORIGINATOR | ||||
SGB Civil Engineering Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Civil Engineering Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 8 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The qualifying learner is capable of:
|
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are already competent in the following:
|
UNIT STANDARD RANGE |
The typical scope of this Unit Standard:
> In different weather and environmental conditions > Preferably in daytime > In different yard layouts/mainline/sidings/private sidings/shed/workshop (might or might not include overhead traction and Railway signalling) > Within a specific time span > By handling heavy materials > Different site conditions, e.g. cuttings, embankments, multiple lines, tunnels, sites with restricted accessibility, etc > Wooden sleepers > Steel sleepers > Concrete sleepers > Transition ladders > Rail substitute sleepers > Sleepers on bridges without ballast > Storage > Loading > Transporting > Stacking > Off-loading > The use of push trolleys and rail transporters to transport permanent way materials |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Prepare to maintain sleepers. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Relevant information pertaining to the type of material and location is obtained and interpreted from inspection reports. |
ASSESSMENT CRITERION 2 |
Quantities are calculated accurately. |
ASSESSMENT CRITERION 3 |
A work plan detailing time frames and resources is compiled according to organisational requirements. |
ASSESSMENT CRITERION 4 |
Material, tools and equipment are obtained and verified for correctness. |
ASSESSMENT CRITERION 5 |
Relevant role-players including team members are made available and informed of their roles and duties. |
ASSESSMENT CRITERION 6 |
Relevant personal protective equipment is identified and applied correctly. |
ASSESSMENT CRITERION 7 |
Appropriate protection is applied in accordance with procedures. |
ASSESSMENT CRITERION 8 |
Work environment is safe-guarded in accordance with regulations and procedures. |
ASSESSMENT CRITERION 9 |
Sleepers and fastenings are inspected and classified according to specifications. |
SPECIFIC OUTCOME 2 |
Replace and space sleeper in track. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Sleepers are handled correctly in accordance with safety and housekeeping procedures and requirements. |
ASSESSMENT CRITERION 2 |
Work is prepared before sleeper is replaced/spaced. |
ASSESSMENT CRITERION 3 |
Sleepers are placed correctly in accordance with instruction. |
ASSESSMENT CRITERION 4 |
Sleepers are spaced correctly according to sleeper reference marks. |
ASSESSMENT CRITERION 5 |
Squareness of sleepers is correct where relevant. |
ASSESSMENT CRITERION 6 |
Appropriate fastenings are placed at required position in accordance with instruction (track gauge). |
ASSESSMENT CRITERION 7 |
Sleeper fastenings are fastened in accordance with specifications. |
SPECIFIC OUTCOME 3 |
Tamp sleepers. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Ballast is boxed in, according to specifications. |
ASSESSMENT CRITERION 2 |
Railway track is lifted according to instruction. |
ASSESSMENT CRITERION 3 |
The correct tamping method is used in accordance with procedures. |
ASSESSMENT CRITERION 4 |
Ballast is trimmed according to correct profile. |
SPECIFIC OUTCOME 4 |
Complete post-maintenance operations. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Quality of completed work is verified and appropriate corrective action is taken where required. |
ASSESSMENT CRITERION 2 |
Basic measurements are performed in accordance with procedures. |
ASSESSMENT CRITERION 3 |
Work site is restored and cleared as per instructions. |
ASSESSMENT CRITERION 4 |
Protection is withdrawn in accordance with procedures. |
ASSESSMENT CRITERION 5 |
Environmental regulations are adhered to during maintenance process. |
ASSESSMENT CRITERION 6 |
Relevant documentation and reports are completed accurately and legibly. |
ASSESSMENT CRITERION 7 |
Role players including team members are informed of their roles and duties. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
Learners can understand the importance of:
|
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Learners can solve problems with regard to:
|
UNIT STANDARD CCFO WORKING |
Learners can work effectively with others and in teams when:
|
UNIT STANDARD CCFO ORGANISING |
Learners can organise and manage one self:
|
UNIT STANDARD CCFO COLLECTING |
Learners can collect, analyse, organise and critically evaluate information by:
|
UNIT STANDARD CCFO COMMUNICATING |
Learners can communicate effectively by:
|
UNIT STANDARD CCFO SCIENCE |
Learners can use science and technology by:
|
UNIT STANDARD CCFO DEMONSTRATING |
Learners can understand:
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49795 | National Certificate: Rail Construction and Maintenance | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | R and H Rail (Pty) Ltd |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |