All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain clearances, safety devices and markers to ensure a safe rail environment |
SAQA US ID | UNIT STANDARD TITLE | |||
119980 | Maintain clearances, safety devices and markers to ensure a safe rail environment | |||
ORIGINATOR | ||||
SGB Civil Engineering Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Civil Engineering Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 5 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The qualifying learner is capable of:
|
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are competent in the following:
|
UNIT STANDARD RANGE |
The typical scope of this unit standard:
Competency must be demonstrated Horizontal and vertical clearances include: Appropriate corrective action to rectify clearance deviations include: Safety devices include, but are not limited to: |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Prepare to maintain clearances, safety devices and markers. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Instruction is received and interpreted correctly. |
ASSESSMENT CRITERION 2 |
Specific location for maintenance work is identified from work plan. |
ASSESSMENT CRITERION 3 |
Relevant role-players including team members are informed made available. |
ASSESSMENT CRITERION 4 |
Material, tools and equipment are obtained and verified for correctness. |
ASSESSMENT CRITERION 5 |
Relevant personal protective equipment is identified and applied correctly. |
ASSESSMENT CRITERION 6 |
Appropriate protection is afforded in accordance with procedures. |
ASSESSMENT CRITERION 7 |
Work environment is safe guarded in accordance with regulations and procedures. |
ASSESSMENT CRITERION 8 |
Take Occupation is taken correctly in accordance with procedures. |
SPECIFIC OUTCOME 2 |
Maintain horizontal and vertical clearances. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Horizontal clearances are measured at all structures accurately and are compared with relevant tables. |
ASSESSMENT CRITERION 2 |
Vertical clearances are measured at structures where applicable accurately and are compared with relevant tables. |
ASSESSMENT CRITERION 3 |
Cause of deviation is determined from relevant reports. |
ASSESSMENT CRITERION 4 |
Type of corrective action is identified and implemented or refer to relevant role-players. |
ASSESSMENT CRITERION 5 |
Safe working and housekeeping methods and procedures are applied at all times. |
SPECIFIC OUTCOME 3 |
Install and/or maintain safety devices and fouling points. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Safety device is positioned correctly. |
ASSESSMENT CRITERION 2 |
Correct installation methods are applied according to acceptable practice. |
ASSESSMENT CRITERION 3 |
Visibility (including painting) of safety device and fouling points is ensured according to plan. |
ASSESSMENT CRITERION 4 |
Correct functioning of safety device is ensured using correct techniques. |
ASSESSMENT CRITERION 5 |
Safety devices are repaired and or replaced where required. |
ASSESSMENT CRITERION 6 |
Locking apparatus for derailing devices are intact at all times. |
SPECIFIC OUTCOME 4 |
Complete post-maintenance operations. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Quality of completed work is verified in accordance with relevant specifications and appropriate corrective action is taken where required. |
ASSESSMENT CRITERION 2 |
Measurements are taken where relevant. |
ASSESSMENT CRITERION 3 |
Work site is restored and cleared as per instructions. |
ASSESSMENT CRITERION 4 |
Occupation is taken correctly and protection withdrawn in accordance with procedures. |
ASSESSMENT CRITERION 5 |
Environmental regulations are adhered to during maintenance process. |
ASSESSMENT CRITERION 6 |
Relevant documentation and reports are completed accurately and legibly and role-players informed. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
Learners can understand the importance of:
|
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Learners can solve problems with regard to:
|
UNIT STANDARD CCFO WORKING |
Learners can work effectively with others and in teams when:
|
UNIT STANDARD CCFO ORGANISING |
Learners can organise and manage one self:
|
UNIT STANDARD CCFO COLLECTING |
Learners can collect, analyse, organise and critically evaluate information by:
|
UNIT STANDARD CCFO COMMUNICATING |
Learners can communicate effectively by:
|
UNIT STANDARD CCFO SCIENCE |
Learners can use science and technology by:
|
UNIT STANDARD CCFO DEMONSTRATING |
Learners can understand:
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 49795 | National Certificate: Rail Construction and Maintenance | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | R and H Rail (Pty) Ltd |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |