All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain rails |
SAQA US ID | UNIT STANDARD TITLE | |||
119977 | Maintain rails | |||
ORIGINATOR | ||||
SGB Civil Engineering Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Civil Engineering Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 21 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The qualifying learner is capable of:
|
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are competent in the following:
|
UNIT STANDARD RANGE |
The typical scope of this Unit Standard:
Competency must be demonstrated: This Unit Standard includes the maintenance of: The Unit Standard excludes the maintenance of: Rail joints include: Handling includes: Actions to maintain rail joints could include: |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Prepare for rail maintenance. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Relevant information pertaining to the type of maintenance work and location is obtained and interpreted from inspection reports. |
ASSESSMENT CRITERION 2 |
Quantities are calculated accurately. |
ASSESSMENT CRITERION 3 |
A work plan detailing time frames and resources is compiled using organisational procedures. |
ASSESSMENT CRITERION 4 |
Condition of rails and fastenings is inspected and rail properties considered in accordance with safety requirements. |
ASSESSMENT CRITERION 5 |
Material, tools and equipment are obtained and verified for correctness. |
ASSESSMENT CRITERION 6 |
Relevant role-players including team members are informed and made available. |
ASSESSMENT CRITERION 7 |
Relevant personal protective equipment is identified and applied correctly. |
ASSESSMENT CRITERION 8 |
Appropriate protection is afforded in accordance with procedures. |
ASSESSMENT CRITERION 9 |
Occupation is taken correctly, in accordance with procedures. |
ASSESSMENT CRITERION 10 |
Work environment is safe guarded in accordance with regulations and procedures. |
SPECIFIC OUTCOME 2 |
Prepare rails for placement. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Correct rail profile is selected in accordance with condition of existing rail. |
ASSESSMENT CRITERION 2 |
Rails are handled in accordance with safe working methods and procedures. |
ASSESSMENT CRITERION 3 |
Correct off-sets are calculated in accordance with formula. |
ASSESSMENT CRITERION 4 |
Rails are bent in accordance with rail bending instructions and specifications. |
ASSESSMENT CRITERION 5 |
Measurements of rail length are determined accurately. |
ASSESSMENT CRITERION 6 |
Rails are cut in accordance with track standard specifications. |
ASSESSMENT CRITERION 7 |
Rail is drilled in accordance with instructions and specifications. |
SPECIFIC OUTCOME 3 |
Replace rails. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Temperature is taken, recorded and correlated with destressing range tables, for a specific section. |
ASSESSMENT CRITERION 2 |
Jumper cables are fitted correctly and safely, where applicable. |
ASSESSMENT CRITERION 3 |
Existing rails in railway track are cut and bent in accordance with track standard specifications. |
ASSESSMENT CRITERION 4 |
Fastenings are loosened and existing rails removed according to organisational practice. |
ASSESSMENT CRITERION 5 |
Track is destressed if required in accordance with destressing range for a specific section. |
ASSESSMENT CRITERION 6 |
New rails are inserted into track in accordance with track specifications and instructions. |
ASSESSMENT CRITERION 7 |
New rails are fastened onto sleepers. |
ASSESSMENT CRITERION 8 |
New rails are fastened to existing rails in accordance with company specifications. |
ASSESSMENT CRITERION 9 |
Welding is prepared where required. |
ASSESSMENT CRITERION 10 |
Transposition is done in accordance with prescribed procedures, where required. |
ASSESSMENT CRITERION 11 |
Safe working methods and procedures are applied at all times. |
SPECIFIC OUTCOME 4 |
Maintain rail joints. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Appropriate action is identified and implemented to maintain rail joints. |
ASSESSMENT CRITERION 2 |
Preparations for welding is done where required. |
ASSESSMENT CRITERION 3 |
Broken or worn fastenings are replaced and loose fastenings secured. |
ASSESSMENT CRITERION 4 |
Vertical and horizontal alignment is correct. |
ASSESSMENT CRITERION 5 |
Expansion gaps between rails are re-set correctly. |
ASSESSMENT CRITERION 6 |
Safe working methods and procedures are applied at all times. |
SPECIFIC OUTCOME 5 |
Complete post maintenance operations. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Evaluate Quality of completed work is evaluated in accordance with relevant track standards, instructions and specifications and appropriate corrective action taken where required. |
ASSESSMENT CRITERION 2 |
Work site is restored and cleared as per instructions. |
ASSESSMENT CRITERION 3 |
Occupation is cancelled correctly and protection withdrawn in accordance with procedures. |
ASSESSMENT CRITERION 4 |
Environmental regulations are adhered to during maintenance process. |
ASSESSMENT CRITERION 5 |
Relevant documentation and reports are completed accurately and legibly. |
ASSESSMENT CRITERION 6 |
Role-players including team members are informed on an ongoing basis of relevant information. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
Learners can understand the importance of:
|
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Learners can solve problems with regard to:
|
UNIT STANDARD CCFO WORKING |
Learners can work effectively with others and in teams when:
|
UNIT STANDARD CCFO ORGANISING |
Learners can organise and manage one self:
|
UNIT STANDARD CCFO COLLECTING |
Learners can collect, analyse, organise and critically evaluate information by:
|
UNIT STANDARD CCFO COMMUNICATING |
Learners can communicate effectively by:
|
UNIT STANDARD CCFO SCIENCE |
Learners can use science and technology by:
|
UNIT STANDARD CCFO DEMONSTRATING |
Learners can understand:
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 49795 | National Certificate: Rail Construction and Maintenance | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | R and H Rail (Pty) Ltd |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |