All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Perform a product movement start-up at a pipeline depot |
SAQA US ID | UNIT STANDARD TITLE | |||
117703 | Perform a product movement start-up at a pipeline depot | |||
ORIGINATOR | ||||
SGB Rail and Pipeline Operations | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 11 - Services | Transport, Operations and Logistics | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 14 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The learner credited with this unit standard will be able to perform a product movement start-up in accordance with company-specific policies procedures and instructions by operating and monitoring pipeline equipment safely and timeously, thereby ensuring the timeous, safe and continuous operation of the pipeline by transporting petroleum products efficiently, thus contributing positively to the Southern African economy.
This unit standard will contribute to the full development of the learner within the pipeline operations. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the Pipeline Transport environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
Performance must be carried out:
When entrance is required to HT substations, the learner must have a valid electrical safety certificate. This unit standard includes the utilisation of high- and low-pressure manifolds. This unit standard includes the manual and automatic operation of pipeline equipment. This unit standard excludes the shut-down and operating (run mode) of the pipeline. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Start up product movement by utilising company-specific operating systems, software and pipeline equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Start up instruction is interpreted correctly and adhered to according to company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 2 |
Operating systems are utilised effectively to control pipeline equipment and routes in accordance with company-specific policies, procedures and instructions. |
ASSESSMENT CRITERION 3 |
Pipeline equipment is started/activated correctly as per company-specific policies, procedures and instructions. |
ASSESSMENT CRITERION 4 |
Correct pump combinations are activated as per start-up procedure. |
ASSESSMENT CRITERION 5 |
Substandard conditions are identified, recorded and reported timeously to relevant role players using available systems. |
SPECIFIC OUTCOME 2 |
Communicate relevant information regarding the start-up status of product movement in the pipeline depot with all relevant role players. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Reporting is performed correctly and timeously as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 2 |
Communication systems are used correctly. |
ASSESSMENT CRITERION 3 |
Product movement start-up information is confirmed with relevant role players continuously as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 4 |
Substandard conditions are identified, recorded and reported timeously to relevant role players using available systems. |
ASSESSMENT CRITERION 5 |
Relevant documentation is completed accurately and timeously as per company-specific procedures, policies and instructions. |
SPECIFIC OUTCOME 3 |
Deal with substandard conditions and implement the corrective actions related to the start-up of the pipeline equipment and initial product movement. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Equipment failures are correctly prioritised and reacted to according to the extent and safety implications. |
ASSESSMENT CRITERION 2 |
Corrective actions are reported and recorded according to company-specific policies, procedures and instructions. |
ASSESSMENT CRITERION 3 |
Corrective actions are implemented correctly according to company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 4 |
Product specification deviations are correctly prioritised and reacted to according to the type and extent. |
SPECIFIC OUTCOME 4 |
Monitor the initial performance of the pipeline equipment and product movement. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Pipeline equipment is monitored as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 2 |
Product movement operating conditions are monitored as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 3 |
Substandard conditions are identified, reacted to, recorded and reported to the relevant role players timeously. |
SPECIFIC OUTCOME 5 |
Capture information on the applicable information system relevant to the start-up of pipeline equipment and initial product movement. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Applicable information system is identified and logged on correctly. |
ASSESSMENT CRITERION 2 |
Specific information system is utilised effectively to capture relevant information. |
ASSESSMENT CRITERION 3 |
Captured information is verified for accuracy and validity. |
ASSESSMENT CRITERION 4 |
Utilisation of specific information system is correctly prioritised in accordance with company-specific policies, procedures and instructions. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. An individual wishing to be assessed against this unit standard may apply to an assessment agency, assessor or provider institution that has been accredited by the relevant ETQA.
2. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA. 3. Any institution offering learning that will enable achievement of this unit standard must be registered and accredited as a provider with the relevant ETQA as prescribed. 4. Moderation of assessment will be done by the relevant ETQA as prescribed. 5. Anyone assessing a learner against this unit standard must be certified as competent against this unit standard and registered as an assessor to assess this unit standard. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The learners can understand and explain the following related to the start-up of pipeline equipment
- OHS Act and regulations - Environmental Act |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
Learner and societal development.
Learners can understand the importance of: |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Problem-solving.
Learners can solve problems with regards to: |
UNIT STANDARD CCFO WORKING |
Team work.
Learners can work effectively in teams when: |
UNIT STANDARD CCFO ORGANISING |
Self-organisation and self-management.
A learner can organise and manage himself by: |
UNIT STANDARD CCFO COMMUNICATING |
Communication.
Learners can communicate information effectively with relevant role-players by utilising various communication systems regarding the: |
UNIT STANDARD CCFO SCIENCE |
Use of science and technology.
Learners can use science and technology by using: |
UNIT STANDARD CCFO DEMONSTRATING |
Inter-relatedness of systems.
|
UNIT STANDARD CCFO CONTRIBUTING |
Information evaluation.
Learners can interpret and evaluate information with regard to: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Assessment process
1. Assessment methods 1. Practical tests 2. Oral/on-the-job 3. In situ (on-the-job) observations 4. Simulation 5. Structured classroom discussions and oral tests These methods must be selected carefully based on the purpose of the assessment (for example, on-the-job demonstration for practical competence). The assessment must integrate a number of different methods (no less than two of those detailed above) in order to give the assessor reliable and valid proof of competence and evidence of required attitudes. 2. The following tools may be used to supplement the above minimum assessment methods: Valid, reliable and authentic evidence (presented as a portfolio of evidence) from past achievements and experience may serve to supplement the assessment of applied competence. The portfolio should include inter alia: 1. Written statements from persons (e.g. current and / or previous employer/s, colleagues, peers, managers, external customers) confirming competence of the learner. 2. Previous assessment records. 3. Logbook or registers stating evidence of performance. Values In addition, the following values should be demonstrated: Supplementary information Terminology Operations notice refers to a job instruction that stipulates product movement. Operations systems refers to a supervisory, control and data acquisition system (SCADA). Information systems refers to the company's specific computer operation management systems e.g. operation management systems (OMS), front-end processor (FEP), system application processes (SAP), metering data system (MDS), etc. Depot refers to an intake, delivery and through pump station. Substandard refers to the deviation from specifications and/or standards. Reporting includes relaying of information. Communication protocol can include, but is not limited to: Communication systems can include, but is not limited to: Start-up refers to the initialising of product movement at an intake, through or delivery pipeline depot. HT refers to electrical high-tension. Certification The learner will be certified as competent when he/she is able to perform a start-up of product movement at a depot in accordance with company-specific policies, procedures and instructions. Credits Total hours required by the learner to achieve the required outcomes: Activity Total-141 Credits achieved: 14 |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 49216 | National Certificate: Pipeline Operations | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |