All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Operate wrapping machine |
SAQA US ID | UNIT STANDARD TITLE | |||
117246 | Operate wrapping machine | |||
ORIGINATOR | ||||
SGB Wood Products | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 01 - Agriculture and Nature Conservation | Forestry and Wood Technology | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 10 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for people who operate the wrapping machine to packet the 10 boxes of matches into the wrapping paper, whilst adhering to other agreed standards pertaining to performance, safety, quality, and the environment. People credited with this unit standard are able to:
|
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
A Learner who wishes to enter a learning programme for this Unit Standard must be able to demonstrate:
|
UNIT STANDARD RANGE |
Either 16 or 24 movement.
The scope of the Unit Standard covers: The context of the Unit Standard relates to the training of a Learner at NQF level 2 in the activity of match manufacturing. The level assigned to this Unit Standard, i.e. Level 2, is appropriate because it entails the training of a novice in match manufacturing is a progression of the skills acquired from Levels 2 to 4. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Start the VAT machine. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The glue pot and the applicators are assembled and fed into the machine as per work instructions. |
ASSESSMENT CRITERION 2 |
Over-wrap is collected from cardboard conversion area as per product specification on production plan. |
ASSESSMENT CRITERION 3 |
Glue pot is filled to ¼ of the glue applicator as per work instructions. |
ASSESSMENT CRITERION 4 |
Over-wrap is loaded and fed into the VAT machine. |
ASSESSMENT CRITERION 5 |
Vat feed conveyor is loaded with double rows of matchboxes from the VPO or storage cases. |
ASSESSMENT CRITERION 6 |
Machine is cycled manually to produce 4 packets which are checked for defects (Range: tear off overwrap, barcode, registration, adhesion to boxes, 9 box packet, loose folds, open flaps, excessive glue, uneven wrap, tight packet and dirty overwrap). |
ASSESSMENT CRITERION 7 |
Machine is started up as per working instructions. |
SPECIFIC OUTCOME 2 |
Process the match boxes into match packets. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Constant feed pressure of matchboxes from the VPO is maintained as per work instructions. |
ASSESSMENT CRITERION 2 |
10 boxes are wrapped per packet as per production requirements. |
ASSESSMENT CRITERION 3 |
Tracking of the over-wrap is monitored to ensure that both flaps of the VAT packet are about equal size. |
ASSESSMENT CRITERION 4 |
Glue level in the pot is monitored and topped if low as per work instructions. |
ASSESSMENT CRITERION 5 |
Glue scraper is adjusted (forward or backwards) to maintain the correct glue application on the over-wrap. |
ASSESSMENT CRITERION 6 |
Reel guide roller is adjusted to ensure that no wobbling is created as per work instructions. |
ASSESSMENT CRITERION 7 |
Paper guide plate is adjusted to ensure that the paper gripper is catching the paper. |
ASSESSMENT CRITERION 8 |
Four completed packets are quality checked every 30 minutes as per quality requirements. (Range: tear off overwrap, barcode, registration, adhesion to boxes, 9 box packet, loose folds, open flaps, excessive glue, uneven wrap, tight packet and dirty overwrap). |
ASSESSMENT CRITERION 9 |
Problems beyond operators' scope are referred to the Team Leader. |
ASSESSMENT CRITERION 10 |
Scrap packets are re-sorted immediately as per work instructions. |
ASSESSMENT CRITERION 11 |
The reel of overwrap is replaced as required with the correct products during product changes as per the production plan or replaced with a new reel when the reel is empty. |
ASSESSMENT CRITERION 12 |
Reel cores are stacked neatly for re-use in the future. |
SPECIFIC OUTCOME 3 |
Maintain supply line of match boxes to VAT machine. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The VAT feed conveyor is loaded with double rows of matchboxes either from the VPO or with reclaimed product or storage cases. |
ASSESSMENT CRITERION 2 |
A constant feed pressure into the VAT machine is maintained as per work instructions. |
ASSESSMENT CRITERION 3 |
Reclaimed boxes are collected and fed to the VAT conveyor during machine stops. |
ASSESSMENT CRITERION 4 |
The VAT conveyor is continuously fed with matchboxes from the storage cases in the event of the VPO stopping. |
SPECIFIC OUTCOME 4 |
Check quality of product. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Brand of over-wrap used is checked to ensure compliance with quality requirements. |
ASSESSMENT CRITERION 2 |
Glue is checked for cleanliness. |
ASSESSMENT CRITERION 3 |
Badly printed reels of over-wrap are rejected as per quality specifications. |
ASSESSMENT CRITERION 4 |
Damaged boxes and boxes with protruding matches are removed before they reach the VAT machine. |
ASSESSMENT CRITERION 5 |
Tracking is corrected when necessary to ensure that both flaps of the VAT packet are equal in size as per quality requirements. |
ASSESSMENT CRITERION 6 |
Glue level is maintained at ¼ of the glue applicator. |
ASSESSMENT CRITERION 7 |
Loose or open flaps, excessive glue and untidy packets are checked and corrective action is taken if non-compliance is found as per quality requirements. |
SPECIFIC OUTCOME 5 |
Shutdown the VAT machine. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The VAT machine is switched off as per work instructions. |
ASSESSMENT CRITERION 2 |
Glue pot and applicators are removed from the VAT machine as per work instructions. |
ASSESSMENT CRITERION 3 |
The glue pot and applicators are disassembled and cleaned as per work instructions. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
An individual who wishes to be assessed against this Unit Standard may apply to, or inform, his immediate superior in the relevant workplace, to request management to arrange for his / her assessment by the relevant assessor accredited for this purpose by the ETQA of the FIETA. Accreditation for this Unit Standard shall be from the relevant Education and Training Quality Assurer (FIETA ETQA) through formative and summative assessment by a registered Assessor. Assessment should be contextual and be conducted in the workplace as far as possible.
The relevant NSB and SGB should be notified of any feedback related to this qualification. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
A demonstrated understanding of:
Match manufacturing principles and practical application in the match manufacturing environment, in addition with knowledge of Safety/Environmental/Health issues. |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems, using critical and creative thinking in the match manufacturing area. |
UNIT STANDARD CCFO WORKING |
Work effectively in a team, group, organisation or community. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and one's activities responsibly and effectively. |
UNIT STANDARD CCFO COLLECTING |
Collect, clean, store and deliver tools and instruments utilized in his/her work area in an effective and efficient manner. |
UNIT STANDARD CCFO COMMUNICATING |
Listen, understand instructions and verbally report in an effective manner to his/her superior. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
The Outcomes that Learners achieve will be judged subject to these being achieved:
Values: The use of tasks and materials in the learning event plan should not discriminate against learners on any grounds prescribed in the Bill of Rights and Employment Equity Act and should promote the orientations outlined in the critical cross-field outcomes. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49082 | GETC: Wood Products Processing | Level 1 | NQF Level 01 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | FPMSETA |
Elective | 49083 | National Certificate: Wood Products Processing | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | FPMSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | AFRICAN MULTISKILLS DEVELOPMENT AND TRAINING |
2. | ENB TRAINING SERVICEPTYLTD |
3. | FUTURE DISCOVERY TRAINING ACADEMY |
4. | Imara Umbono Incorporated (Pty) Ltd |
5. | MGS GCABA CONTRACTING & TRADING CC |
6. | Optimi Workplace |
7. | TAMASA TRAINING PTY LTD |
8. | TIRHANI SKILLSTRAINING PTY LTD |
9. | VEB CELE & ASSOCIATES PTY LTD |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |