All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Install an apparatus case |
SAQA US ID | UNIT STANDARD TITLE | |||
116852 | Install an apparatus case | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 3 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
A learner credited with this unit standard will be able to install an apparatus case according to plans and specifications by applying signalling engineering practice. This will ensure the availability of correctly installed apparatus cases that contribute in part to a reliable railway signalling system, safe and efficient train operations and effective rail transportation. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
The credit value assigned to this unit standard is appropriate because performance must be carried out:
1. In a controlled environment. 2. Within a specified time. 3. Under simulated or actual operational conditions. When overhead traction equipment is present, the learner must have a valid certificate related to high voltage equipment, which certifies the learner to work under the specific conditions. This standard includes the: This standard excludes the assembly and wiring of an apparatus case. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and procure the resources required to install an apparatus case safely and correctly. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The job order is interpreted to establish the relevant resources required to install an apparatus case. |
ASSESSMENT CRITERION 2 |
The correct plans and/or diagrams for the installation of an apparatus case are obtained and verified. |
ASSESSMENT CRITERION 3 |
The correct resource requirements are determined and obtained to install an apparatus case according to specifications. |
ASSESSMENT CRITERION 4 |
Resources are verified against material specifications and any sub-standards rectified. |
SPECIFIC OUTCOME 2 |
Install an apparatus case safely and correctly according to the installation plans/diagrams within the allocated time at the relevant site. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
An apparatus case is installed as per plans/diagrams and specifications. |
ASSESSMENT CRITERION 2 |
Safe working procedures, policies and instructions are adhered to. |
ASSESSMENT CRITERION 3 |
The assisting personnel are supervised when such personnel are utilised.ly dealt with. |
ASSESSMENT CRITERION 4 |
The installation site is prepared and secured according to procedures, policies and instructions to allow the installation task to be completed safely. |
ASSESSMENT CRITERION 5 |
Installation of an apparatus case is completed within the allocated time. |
ASSESSMENT CRITERION 6 |
Unforeseen circumstances related to the installation of an apparatus case are correct |
SPECIFIC OUTCOME 3 |
Perform quality checks on the installation of an apparatus case according to procedures, policies and instructions. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Relevant quality checks are performed correctly on the installed apparatus case according to procedures, policies and instructions. |
ASSESSMENT CRITERION 2 |
Non-conformance to specifications indicated by quality checks are addressed correctly. |
ASSESSMENT CRITERION 3 |
Relevant documentation related to the quality checks performed on the installed apparatus case is completed according to procedures, policies and instructions. |
ASSESSMENT CRITERION 4 |
Communicate with relevant role players during the installation of an apparatus case. |
ASSESSMENT CRITERION 5 |
Specific communication protocol with relevant role players is adhered to when applicable (e.g. Operating and Protection Personnel). |
ASSESSMENT CRITERION 6 |
Relevant communication media is used according to company-specific policies and instructions. |
ASSESSMENT CRITERION 7 |
Communication is clear and concise. |
SPECIFIC OUTCOME 4 |
Restore the installation site as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Hazardous and waste material is safely disposed of as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 2 |
All equipment housing lids, doors, covers, locks, etc. are replaced and secured as per company-specific procedures policies and instructions. |
ASSESSMENT CRITERION 3 |
The site is restored as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 4 |
Material, equipment and tools are returned for storage or repair as per company-specific procedures, policies and instructions. |
SPECIFIC OUTCOME 5 |
Hand over the installed apparatus case for commissioning. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Relevant role-players are timeously advised of completion of task. |
ASSESSMENT CRITERION 2 |
Documentation applicable to signing off of the installation task is completed. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. An individual wishing to be assessed against this unit standard may apply to an assessment agency, assessor or provider institution that has been accredited by the relevant ETQA.
2. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA. 3. Any institution offering learning that will enable achievement of this unit standard must be registered and accredited as a provider with the relevant ETQA as prescribed. 4. Moderation of assessment will be done by the relevant ETQA as prescribed. 5. Anyone assessing a learner against this unit standard must be certified as competent against this unit standard and registered as an assessor to assess this unit standard. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The learners can understand and explain the following related to the installation of an apparatus case:
OHS Act and regulations Safe working procedures Company-specific policies, procedures and instructions |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Problem-solving
Learners can solve problems with regard to: |
UNIT STANDARD CCFO WORKING |
Team work
Learners can work effectively in teams when: |
UNIT STANDARD CCFO ORGANISING |
Self-organisation and self-management
A learner can organise and manage himself by: |
UNIT STANDARD CCFO COLLECTING |
Information evaluation
Learners can interpret and evaluate the contents of: |
UNIT STANDARD CCFO COMMUNICATING |
Communication
Learners can communicate effectively with relevant role-players related to the installation of an apparatus case. |
UNIT STANDARD CCFO SCIENCE |
Use of science and technology
Learners can use science and technology by using: |
UNIT STANDARD CCFO DEMONSTRATING |
Inter-relatedness of systems
Learners can understand the role of the apparatus case in a railway signalling system. |
UNIT STANDARD CCFO CONTRIBUTING |
Learner and societal development
Learners can understand the importance of |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Assessment process:
1. Assessment methods: These methods must be selected carefully based on the purpose of the assessment (for example, the written method could be used to assess knowledge, or on-the-job demonstration for practical competence). The assessment must integrate a number of different methods (no less than three of those detailed above) in order to give the assessor reliable and valid proof of competence and evidence of required attitudes. 2. The following may be used to supplement the above minimum assessment methods: Valid, reliable and authentic evidence (presented as a portfolio of evidence) from past achievements and experience may serve to supplement the assessment of applied competence. The portfolio should include inter alia: Values: In addition, the following values should be demonstrated: Supplementary information: Terminology Job order refers to: Installation plan/diagram refers to a drawing or plan. Sub-standard refers to the deviation from specifications and/or standards. Site refers to field location. Installation notice refers to the notification of time, date, location and operational conditions applicable to the installation of the apparatus case. Communication can include, but is not limited to: Installation procedure refers to the step-by-step method of installation. Installation specifications refer to size, quality, type of materials, etc. Non-conformance refers to a sub-standard. Communication media can include, but is not limited to: High-voltage equipment refers to overhead traction equipment (OHTE) used to power electric locomotives and high-voltage transmission lines. Commissioning refers to the process of certifying the correct functioning of the apparatus case and relevant interlocking system. Installation includes the installation and termination of the signalling cables. Installation means placing assembled and/or wired equipment in the required position and electrically and/or mechanically connecting the equipment to form a complete system. Certification: The learner will be certified as competent when a typical apparatus case as used in the signalling environment has been correctly installed to specification. Credits: Total hours required by the learner to achieve the required outcomes: Activity-Hours Theory-6 Practical-12 Self-directed learning-2 On-the-job learning-6 Assessment-6 Total-32 Credits achieved: 3- |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 49066 | National Certificate: Railway Signalling: Installation and Scheduled Maintenance of Equipment | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |