All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Wire an electrical points machine |
SAQA US ID | UNIT STANDARD TITLE | |||
116851 | Wire an electrical points machine | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 3 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
A learner credited with this unit standard will be able to wire an electrical points machine according to plans and specifications by applying signalling engineering practice. This will ensure the availability of correctly wired electrical points machines which contribute in part to a reliable railway signalling system, safe and efficient train operations and effective rail transportation. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
The credit value assigned to this unit standard is appropriate because performance must be carried out:
1. In a controlled environment. 2. Within a specific time. 3. At a field site or in a workshop (might or might not include overhead traction equipment). 4. Under simulated or actual operational conditions. This standard includes the wiring of: 1. Electrical points machines 2. Electrical lock and detectors 3. Mechanisms based on the "Clamp-lock" principle This standard excludes the assembly and installation of electrical points machines. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and procure the resources required to perform the wiring of an electrical points machine safely and correctly. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The job order is interpreted to establish the relevant resources required to perform the wiring of an electrical points machine as per specification. |
ASSESSMENT CRITERION 2 |
The correct plans for the wiring of an electrical points machine are obtained and verified against the job order. |
ASSESSMENT CRITERION 3 |
Identify the applicable safe working procedures to be adhered to during performance of the task as per company policy. |
ASSESSMENT CRITERION 4 |
The required resources are obtained according to the assembly specification. |
ASSESSMENT CRITERION 5 |
The resources are verified against material specifications and sub-standards rectified |
SPECIFIC OUTCOME 2 |
Wire an electrical points machine safely and correctly according to a wiring plan within the allocated time at a suitable site. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
An electrical points machine is wired as per plan and specifications. |
ASSESSMENT CRITERION 2 |
Safe working procedures are adhered to as per company policies and instructions. |
ASSESSMENT CRITERION 3 |
The assisting personnel are supervised when such personnel are utilised. |
ASSESSMENT CRITERION 4 |
A suitable and safe site is prepared and secured according to procedures, policies and instructions. |
ASSESSMENT CRITERION 5 |
Wiring of an electrical points machine is completed within the allocated time. |
ASSESSMENT CRITERION 6 |
Unforeseen circumstances related to the wiring of an electrical points machine are correctly dealt with. |
SPECIFIC OUTCOME 3 |
Perform quality checks on a wired electrical points machine according to procedures, policies and instructions. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Relevant quality checks are performed correctly on a wired electrical points machine according to procedures, policies and instructions. |
ASSESSMENT CRITERION 2 |
Quality checks indicating non-conformance to specifications are addressed correctly. |
ASSESSMENT CRITERION 3 |
Relevant documentation related to the quality checks performed on a wired electrical points machine is completed according to procedures, policies and instructions. |
ASSESSMENT CRITERION 4 |
Communication related to the wiring of an electric points machine is carried out effectively. |
ASSESSMENT CRITERION 5 |
Applicable documentation is completed correctly as per company policies |
SPECIFIC OUTCOME 4 |
Restore the site and store or secure a wired electrical points machine as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
All equipment housing lids, doors, covers, locks, etc. are replaced and secured as per company-specific procedures policies and instructions. |
ASSESSMENT CRITERION 2 |
Hazardous and waste material is safely disposed of as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 3 |
The site is restored as per company-specific procedures, policies and instructions. |
ASSESSMENT CRITERION 4 |
The wired electrical points machine is stored or secured as per material storage policy. |
ASSESSMENT CRITERION 5 |
Material, equipment and tools are returned for storage or repair as per company-specific procedures policies and instructions. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. An individual wishing to be assessed against this unit standard may apply to an assessment agency, assessor or provider institution that has been accredited by the relevant ETQA.
2. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA. 3. Any institution offering learning that will enable achievement of this unit standard must be registered and accredited as a provider with the relevant ETQA as prescribed. 4. Moderation of assessment will be done by the relevant ETQA as prescribed. 5. Anyone assessing a learner against this unit standard must be certified as competent against this unit standard and registered as an assessor to assess this unit standard. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The learners can understand and explain the following related to the wiring of an electrical points machine:
1. Planning and procurement 2. Wiring plans/diagrams/schedules/symbols 3. Identification, purpose and function of an electrical points machine and detector, as well as its parts and components 4. Wiring/termination practices and company-specific specifications 5. Material identification 6. Function, purpose and safe use of applicable electrical test instruments 7. Restoration of site 8. Relevant extracts from: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Problem-solving
Learners can solve problems with regard to: |
UNIT STANDARD CCFO WORKING |
Team work
Learners can work effectively in teams when: |
UNIT STANDARD CCFO ORGANISING |
Self-organisation and self-management
A learner can organise and manage himself by: |
UNIT STANDARD CCFO COLLECTING |
Information evaluation
Learners can interpret and evaluate the contents of: |
UNIT STANDARD CCFO COMMUNICATING |
Communication
Learners can communicate effectively with relevant role-players related to the wiring of an electrical points machine. |
UNIT STANDARD CCFO SCIENCE |
Use of science and technology
Learners can use science and technology by using electrical test instruments. |
UNIT STANDARD CCFO DEMONSTRATING |
Inter-relatedness of systems
Learners can understand the role of the electrical points machine in a railway signalling system. |
UNIT STANDARD CCFO CONTRIBUTING |
Learner and societal development
Learners can understand the importance of: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Assessment process:
1. Assessment methods: These methods must be selected carefully based on the purpose of the assessment (for example, the written method could be used to assess knowledge, or on-the-job demonstration for practical competence). The assessment must integrate a number of different methods (no less than three of those detailed above) in order to give the assessor reliable and valid proof of competence and evidence of required attitudes. 2. The following may be used to supplement the above minimum assessment methods: Valid, reliable and authentic evidence (presented as a portfolio of evidence) from past achievements and experience may serve to supplement the assessment of applied competence. The portfolio should include inter alia: Values: In addition, the following values should be demonstrated: Supplementary information: Terminology Job order refers to: Plan refers to a drawing or diagram. Sub-standard refers to the deviation from specifications and/or standards. Site refers to a workshop or field location. Communication can include, but is not limited to: Communication media can include, but is not limited to: Secure means to make safe, cover, fasten or tie down. Store/storage means to remove item(s) from the work area and place in a designated/prescribed area as per company-specific procedures, policies and instructions. Logbook refers to evidence of training and job performance. Overhead traction equipment (OHTE) refers to the high-voltage equipment used to power electric locomotives. Wiring means connecting individual electrical parts/components to each other by means of electrical/optical conductors. Certification: The learner will be certified as competent when an electrical points machine has been correctly wired to specifications. Credits: Total hours required by the learner to achieve the required outcomes: Activity - Hours Theory - 10 Practical - 16 Self-directed learning - 2 On-the-job learning N/A - 0 Assessment - 6 Total - 34 Credits achieved: 3 |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 49068 | National Certificate: Railway Signalling: Assembly and Wiring of Equipment | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |