All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Time, connect and initiate a blast of a development end using shock tube |
SAQA US ID | UNIT STANDARD TITLE | |||
116668 | Time, connect and initiate a blast of a development end using shock tube | |||
ORIGINATOR | ||||
SGB Mining and Minerals | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 3 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Registered" |
2004-12-02 | 2007-08-16 | SAQA 0857/04 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2008-08-16 | 2011-08-16 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard is replaced by: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
244488 | Connect and initiate a blast of a development end using shock tube | Level 3 | NQF Level 03 | 3 |
PURPOSE OF THE UNIT STANDARD |
The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and contribute to the upliftment and economic growth of the mining and minerals sector.
This unit standard is intended to promote general skills, knowledge and understanding of timing, connecting and initiating a blasty of a development end in the mining and minerals sector in order to ensure knowledgeable and informed workers. People credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credit calculation is based on the assumption that learners are already competent in terms of the following outcomes or areas of learning when starting to learn towards this unit standard:
|
UNIT STANDARD RANGE |
Specific range statements are provided in the body of the unit standard where they apply to particular specific outcomes or assessment criteria. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Explain the specified requirements regarding the timing, connecting and initiating of a blast in a development end using shock tube. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The significant risks and consequences associated with the workplace hazards related to the timing, connecting and initiating of a development end with shock tube are explained. |
ASSESSMENT CRITERION RANGE |
Workplace hazards must include:
|
ASSESSMENT CRITERION 2 |
The significant risks and consequences associated with the work-related hazards related to the timing, connecting and initiating of a development end with shock tube are explained. |
ASSESSMENT CRITERION RANGE |
Work-related hazards must include:
|
ASSESSMENT CRITERION 3 |
The explanation of the various initiating systems used for blasting with shock tube and the reasons for applying each type of initiating system is consistent with specified requirements. |
ASSESSMENT CRITERION RANGE |
Initiating systems must include:
|
ASSESSMENT CRITERION 4 |
The specified requirements pertaining to delay times of accessories used for timing, connecting and initiating a blast in a development end with shock tube are explained. |
ASSESSMENT CRITERION RANGE |
Accessories must include:
|
ASSESSMENT CRITERION 5 |
The meaning of the terms 'timing', 'connecting' and 'initiating' are explained according to specified requirements. |
ASSESSMENT CRITERION 6 |
The meaning of the terms of and reasons for a burn cut, drag round, wedge cut and sliping are explained according to specified requirements. |
SPECIFIC OUTCOME 2 |
Prepare to time, connect and initiate the blast of a development end using shock tube. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The required personal protective equipment is selected, available on person, operational and used in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
The required tools, material, equipment and explosives accessories are selected, available in the workplace, operational and transported according to specified requirements. |
ASSESSMENT CRITERION 3 |
The area where the blast is to be timed, connected and initiated is examined for workplace hazards and these hazards are dealt with according to specified requirements. |
ASSESSMENT CRITERION RANGE |
Workplace hazards must include:
|
ASSESSMENT CRITERION 4 |
Precautions to prevent inadvertent entry of persons during timing, connecting and initiating are taken according to specified requirements. |
ASSESSMENT CRITERION 5 |
The consequences to safety, health and production, if specified requirements are not adhered to whilst preparing to time, connect and initiate the blast of a development end with shock tube are explained. |
ASSESSMENT CRITERION RANGE |
Non-adherence to specified requirements must include those relating to:
|
SPECIFIC OUTCOME 3 |
Time, connect and initiate the blast of a development end using shock tube. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The charged holes are timed and connected according to specified requirements. |
ASSESSMENT CRITERION RANGE |
Timing and connecting must include:
|
ASSESSMENT CRITERION 2 |
Tools and equipment are used in accordance to specified requirements and in line with accepted ergonomic principles. |
ASSESSMENT CRITERION 3 |
Work related hazards are dealt with according to specified requirements. |
ASSESSMENT CRITERION RANGE |
Work related hazards must include:
|
ASSESSMENT CRITERION 4 |
The blast is initiated according to specified requirements. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 5 |
Tools and equipment are prepared and stored for subsequent use and those defective, are dealt with according to specified requirements. |
ASSESSMENT CRITERION 6 |
Explosive accessories not used during timing, connecting and initiating are transported and stored according to specified requirements. |
ASSESSMENT CRITERION 7 |
Interpersonal interaction is positive, consistent with specified requirements and promotes effective teamwork |
ASSESSMENT CRITERION 8 |
Reports are completed and submitted according to specified requirements. |
ASSESSMENT CRITERION 9 |
Consequences to health, safety and production if specified requirements are not adhered to whilst timing, connecting and initiating the blast of a development end with shock tube are explained. |
ASSESSMENT CRITERION RANGE |
Non-adherence to specified requirements must include those relating to:
|
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The following embedded knowledge is addressed in an integrated way in the unit standard
|
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
Note: The ability of the candidate to identify sub-standard and hazardous conditions, assess and take appropriate action. |
UNIT STANDARD CCFO WORKING |
Work effectively with others as members of a team, group, organisation or community.
Note: The ability and willingness of the candidate to accept and interpret work instructions correctly. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage themselves and their activities responsibly and effectively.
Note: The ability of the candidate to indicate what methods, tools and personal protective equipment is required and communicate to fellow workers his/her intentions and assistance required. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
Note: The ability of the candidate to reconcile the information from visual and physical examinations and constantly evaluate the changing situation. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively, using visual, mathematical and/or language skills in the modes of oral and/or written presentations.
Note: The appropriate communication with the relevant personnel with regard to the reporting of hazards and sub-standard conditions will indicate his/her proficiency in effective communication. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically showing responsibility towards the environment and health of others.
Note: The ability of the candidate to use equipment, follow processes and access and record data in a technological environment in accordance with environmental, occupational health and safety requirements. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
Note: The ability of the candidate to identify and refer anomalous behaviour to a specialist confirms understanding that a specific observation, inference, action or decision can have a devastating effect. |
UNIT STANDARD ASSESSOR CRITERIA |
Assessors should keep the following principles in mind when designing and conducting assessments against this unit standard:
|
UNIT STANDARD NOTES |
This unit standard has been replaced by unit standard 244488, which is "Connect and initiate a blast of a development end using shock tube", Level 3, 3 credits.
Terminology: Specified requirements include legal and site-specific requirements and are contained in one or more of the following documents: Legal Site-specific Motivation regarding number of specific outcomes Even though there are less than four specific outcomes in this unit standard it represents a whole competency. It is NOT merely a description of tasks, jobs or procedures but it focuses on outcomes of activity. It also has a broad application across a range of contexts as stipulated in the unit standard. In addition this unit standard is considered as a milestone of learning in the sector. It is worth recognizing in its own right, as it is attributable to and achievable by an individual. This unit standard is fit-for-purpose for the sector and the specific outcomes jointly meet all the competence requirements of the title of the standard. in addition the unit standard has been integrated to avoid artificial distinctions between activities/processes. Unit standard justification Level Attribute-Level-Justification Skills-2-The skills required have some variety but are still fairly simple Procedures-2-Although the procedure is known and familiar (as level 1) it is not as repetitive Context-2-Routine and familiar Knowledge-3-Relevant theoretical knowledge is required to be fully competent Information processing-3-Interpretation as opposed to basic processing is required. Problem Solving-2-The candidate will only have to apply given solution to known/familiar problems. Orientation of activities-3-Directed, with some autonomy Application of responsibility-3-Candidate's output is quality checked Orientation of scope of responsibility-3-Significant responsibility for the quantity and quality of output, and possible responsibility for the output of others Average level: 23/9 = 2. 55 actual level assigned: 3 Credits Total hours required by the learner to achieve the required outcome: Activity-Hours Classroom Teaching-6 On-The-Job Training-24 Total-30 Credits achieved: 30/10 = 3 actual credits assigned: 3. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49013 | National Certificate: Mining Operations: Underground Hard Rock | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2007-08-16 | Was MQA until Last Date for Achievement |
Elective | 49014 | National Certificate: Rockbreaking: Underground Hard Rock | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2007-08-16 | Was MQA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | CONCOR PROJECTS PTY LTD |
2. | FINSCH DIAMOND MINE(PTY) LTD |
3. | FOSKOR (PTY) LTD |
4. | HARMONY GOLD MINING CO LTD |
5. | MODIKWA MINING PERSONNEL SERVICES PTY L TD |
6. | NORTHAM PLATINUM LTD |
7. | PALABORA COPPER (PTY) LTD |
8. | SENZEKO EXECUTIVE RISK CC |
9. | SIBANYE GOLD ACADEMY PROPRIETARY LIMITED |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |