All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Measure construction quantities |
SAQA US ID | UNIT STANDARD TITLE | |||
115443 | Measure construction quantities | |||
ORIGINATOR | ||||
SGB Building Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Physical Planning, Design and Management | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 6 | Level TBA: Pre-2009 was L6 | 16 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Registered" |
2004-08-11 | 2007-08-11 | SAQA 1055/04 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2008-08-11 | 2011-08-11 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The qualifying learner is capable of:
Managing multiple construction projects on more than one construction site, incorporating different construction disciplines A person credited with this unit standard will be able to interpret project documentation with reference to quantities, understand the principles of measuring building and civil works and measure construction projects in order to prepare interim certificates and final account. This unit standard will contribute to the full development of a professional community of Construction Managers. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and / or equivalent:
|
UNIT STANDARD RANGE |
The typical scope of this unit standard:
The learner should be able to measure quantities for multi-storey buildings, civil works and specialist work |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Interpret the project documentation with reference to quantities. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Drawings are interpreted in terms of project documentation. |
ASSESSMENT CRITERION 2 |
Bills of quantities, where applicable, are interpreted in terms of project documentation. |
ASSESSMENT CRITERION 3 |
Project specifications are integrated with drawings, bills of quantities and general conditions of contract. |
SPECIFIC OUTCOME 2 |
Demonstrate an understanding of the principles of measuring building and civil works. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The principles of measurement and documentation used in the standard system of measuring building work are explained. |
ASSESSMENT CRITERION 2 |
The principles of measurement and documentation used in the SABS 1200 system are explained. |
ASSESSMENT CRITERION 3 |
Appropriate clauses to describe work measured on both building and civil projects are developed and used. |
SPECIFIC OUTCOME 3 |
Undertake the measurement of construction projects. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Bills of quantities for multi-storey buildings are measured, abstracted and produced. |
ASSESSMENT CRITERION 2 |
Bills of quantities for civil works are measured, abstracted and produced. |
ASSESSMENT CRITERION 3 |
Bills of quantities for specialist work are measured, abstracted and produced. |
ASSESSMENT CRITERION 4 |
The preliminaries section of the bill is measured and prepared. |
SPECIFIC OUTCOME 4 |
Prepare interim certificates and final account. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Actual quantities of work completed and accepted are calculated according to specifications. |
ASSESSMENT CRITERION 2 |
Measurements and calculations of quantities are made and reflected according to quantity surveying techniques and format. |
ASSESSMENT CRITERION 3 |
Payment certificates and invoices are produced according to company procedures and client requirements. |
ASSESSMENT CRITERION 4 |
Final account is produced according to company procedures and client requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems
Specific Outcome: Assessment Criteria: |
UNIT STANDARD CCFO WORKING |
Work effectively with others
Specific Outcome: Assessment Criteria: |
UNIT STANDARD CCFO ORGANISING |
Employ self management
Specific Outcome: Assessment Criteria: |
UNIT STANDARD CCFO COLLECTING |
Manage information
Specific Outcome: Assessment Criteria: |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively
Specific Outcome: Prepare interim certificates and final account Assessment Criteria: Measurements and calculations of quantities are made and reflected according to quantity surveying techniques and format. |
UNIT STANDARD CCFO SCIENCE |
Demonstrate scientific and technological competence
Specific Outcome: Assessment Criteria: |
UNIT STANDARD CCFO DEMONSTRATING |
Understand Contextual world-systems
Specific Outcome: Assessment Criteria: Specific Outcome: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 48700 | Bachelor of Construction Management: Built Environment | Level 6 | Level TBA: Pre-2009 was L6 | Passed the End Date - Status was "Reregistered" |
2012-06-30 | CHE |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |