All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Repair three phase AC motor control gear |
SAQA US ID | UNIT STANDARD TITLE | |||
10278 | Repair three phase AC motor control gear | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 12 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2005-09-13 | 2008-09-13 | SAQA 0160/05 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2009-09-13 | 2012-09-13 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Electrical Engineering; Generation; Distribution; Transmission, Construction and Renewable Energy Sector.
A person credited with this unit standard will be capable of: Diagnosing and repairing faults on three phase AC motor control gear according to statutory requirements to reinstate the operation of motors and machines. This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and / or equivalent:
|
UNIT STANDARD RANGE |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Follow safety procedures during fault finding and repair of a three phase motor control gear |
OUTCOME NOTES |
Follow safety procedures before, during and after fault finding and repair of a three phase motor control gear. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Job instructions are interpreted and a sequence of operation is determined. |
ASSESSMENT CRITERION 2 |
2. Safety procedures related to complex fault finding are followed throughout the fault finding and repairing process according to worksite procedures. |
ASSESSMENT CRITERION 3 |
3. Work area is prepared according to worksite procedures. |
ASSESSMENT CRITERION 4 |
4. Various incidents that could cause damage or harm to three phase motor control gear are explained during the fault finding and repairing process. |
ASSESSMENT CRITERION 5 |
5. The important of following safety rules and procedures are demonstrated in accordance with statutory requirements and work site procedures. |
SPECIFIC OUTCOME 2 |
Fault find and repair faults on a three phase motor control gear. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The sequence of the operation is observed. |
ASSESSMENT CRITERION 2 |
2. Diagnoses is carried out by comparing the sequence of operations with circuit diagram. |
ASSESSMENT CRITERION 3 |
3. Appropriate measuring and testing equipment are selected. |
ASSESSMENT CRITERION 4 |
4. Correct fault finding techniques are used to locate faults. |
ASSESSMENT CRITERION 5 |
5. Reasons for following the correct procedures are understood and demonstrated in accordance with work site procedures. |
ASSESSMENT CRITERION 6 |
6. The correct use and selection of handtools are diagnose according to worksite procedures. |
SPECIFIC OUTCOME 3 |
Record and report faults on a three phase motor control gear. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. All documentation is completed and handed in. |
ASSESSMENT CRITERION 2 |
2. Environment is restored and all waste material removed according to worksite procedures. |
ASSESSMENT CRITERION 3 |
3. Reasons for following the correct procedures are understood and demonstrated in accordance with work site procedures. |
ASSESSMENT CRITERION 4 |
4. Faults are recorded or reported following work site procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems (identification of defects). |
UNIT STANDARD CCFO WORKING |
Work effectively with others (during the installation commissioning and testing of motor control gear). |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself (identification and selection of motor control gear). |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information (during the installing commissioning and testing of motor control gear). |
UNIT STANDARD CCFO COMMUNICATING |
Communicate (reporting of defects). |
UNIT STANDARD NOTES |
Specified requirements include legal and legislative specific requirements and are contained in one or more of the following documents:
|
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 49646 | Further Education and Training Certificate: Manufacturing Technical Maintenance | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | AgriSETA |
Core | 20420 | National Certificate: Electrical Engineering | Level 4 | NQF Level 04 | Passed the End Date - Status was "Registered" |
2004-02-10 | Was EWSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |