All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain and repair a high voltage security fence system |
SAQA US ID | UNIT STANDARD TITLE | |||
10244 | Maintain and repair a high voltage security fence system | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 4 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Electrical Engineering; Generation; Distribution; Transmission, Construction and Renewable Energy Sector.
A person credited with this unit standard will be able to: This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and / or equivalent:
|
UNIT STANDARD RANGE |
a. Residential b. Industrial c. Mining d. Government e. Recreational. a. OHS Act b. SABS 0142 c. Local Authority requirements a. Safety procedures as given in Safety manuals b. Policy procedures as given in Policy manuals c. Installing procedures as given in Manufacturers` and Company maintenance manuals d. Maintaining procedure given in Manufacturers` and Company maintenance manuals a. Dimensions of components, b. Weight of components, c. Type of material from which components were manufactured as given in: i. Manufacturers` maintenance manuals ii. Manufacturer catalogues iii. Company maintenance manuals |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and prepare to maintain a high voltage security fence system. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Authorisation is obtained according to high voltage permit system. |
ASSESSMENT CRITERION 2 |
2. Documentation is obtained according to work site procedures. |
ASSESSMENT CRITERION 3 |
3. All materials required for maintenance are selected and obtained according to work site procedures. |
ASSESSMENT CRITERION 4 |
4. Appropriate tools and test instruments are identified and selected to meet the requirements of the task and according to statutory requirements. |
SPECIFIC OUTCOME 2 |
Inspect and clean a high voltage security fence system. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Printed circuit boards and enclosures are inspected for cleanliness; faulty components and defects are recorded. |
ASSESSMENT CRITERION 2 |
2. High voltage security fence components are inspected for defects according to manufacturers specifications and defects are recorded. |
ASSESSMENT CRITERION 3 |
3. High voltage security fence conductors and terminations are inspected for hot and loose connections, discoloured connections and defects are recorded. |
ASSESSMENT CRITERION 4 |
4. High voltage security fence system components are inspected for sustainable alarm conditions and defects are recorded. |
SPECIFIC OUTCOME 3 |
Repair, replace and rectify defects on a high voltage security fence system. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Appropriate tools are used to meet the requirements of the task according to statutory requirements. |
ASSESSMENT CRITERION 2 |
2. All faulty components are identified. |
ASSESSMENT CRITERION 3 |
3. Identified faulty components are removed and replaced with correct specification components in line with manufacturers specifications and safety standards. |
ASSESSMENT CRITERION 4 |
4. Modules are calibrated according to manufacturer's specifications. |
SPECIFIC OUTCOME 4 |
Re-commission and complete work on a high voltage security fence system. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Appropriate tools and test instruments are used to meet the requirements of the task according to statutory requirements. |
ASSESSMENT CRITERION 2 |
2. Security fence is inspected according to drawings. |
ASSESSMENT CRITERION 3 |
3. Module settings and alarms are verified according to manufacturer's specifications. |
ASSESSMENT CRITERION 4 |
4. High voltage security fence operation and functionality are tested for correct operation according to manufacturer's specification and deviations are repaired and reported. |
ASSESSMENT CRITERION 5 |
5. Appropriate tools and test instruments are cared for and stored according to statutory requirements. |
ASSESSMENT CRITERION 6 |
6. Completion of the task is reported according to work site procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Knowledge that will help me understand and that I will be able to explain: |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identifying and solving problems using critical and creative thinking. |
UNIT STANDARD CCFO WORKING |
Working effectively with others as a member of a team, group, organisation and community. |
UNIT STANDARD CCFO ORGANISING |
Organise oneself and one`s activities responsibly and effectively in the ability to follow instructions when working by ones self or in a work team, ensure safe execution of work activities. |
UNIT STANDARD CCFO COMMUNICATING |
Effective use of communication methods when giving instructions to fellow workers, recording and reporting information. |
UNIT STANDARD CCFO DEMONSTRATING |
Tasks using responsible thinking and decision making in relation to the use of tools and equipment; choice and use of relevant personal protecting equipment and safety equipment. |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This Unit Standard was originally registered on 12 June 2002 under SAQA decision number 0742/02. It has been re-registered on 11 February 2004 under SAQA 2552/04. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 20418 | National Certificate: Electrical Engineering | Level 2 | NQF Level 02 | Passed the End Date - Status was "Registered" |
2004-02-10 | Was EWSETA until Last Date for Achievement |
Elective | 72051 | National Certificate: Electrical Engineering | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Elective | 48475 | National Certificate: Electrical Engineering | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2009-02-18 | Was EWSETA until Last Date for Achievement |
Elective | 20419 | National Certificate: Electrical Engineering | Level 3 | NQF Level 03 | Passed the End Date - Status was "Registered" |
2004-02-10 | Was EWSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | CLEAN HEAT ENERGY SAVING SOLUTIONS (PTY) LTD |
2. | Majuba TVET College |
3. | Motheo TVET College |
4. | MSC ARTISAN ACADEMY |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |